Laserfiche WebLink
6115.0410 <br />MINNESOTA RULES 78 <br />Subp. 2. Permit application. A separate application, including a preliminary report for each <br />new dam or each dam proposed to be enlarged, shall be filed with the commissioner upon forms <br />provided by the commissioner which shall contain the following: <br />A. name and address of the owner(s) or prospective owner; <br />B. purpose; <br />C. location, type, size, and height of the dam; and <br />D. storage capacity of the impoundment. <br />For waste impoundment dams, the permit application shall include facts necessary for the <br />issuance of a permit which extends throughout the life of the impoundment project. <br />Subp. 3. Preliminary report. The preliminary report shall consist of: <br />A. A general statement setting forth the effect on the environment. <br />B. Maps showing the location of county, township, and section lines; the outline of the <br />impoundments; the location of state, county, and township roads; the locations of utilities, e.g. <br />pipelines, transmission, telegraph, and telephone lines; the topography; and other structure or <br />facilities including dwellings affected by the proposed dam. State, county, and USGS maps and <br />aerial photographs may be used for this purpose. <br />C. A written report of surface conditions, i.e. geology, topography, which is based on a <br />field examination by the applicant's engineer and other qualified personnel. <br />D. Typical cross -sections of the dam accurately showing elevations, proposed impoundment <br />levels, and top width. <br />E. Logs of borings in the foundation and in the borrow areas, and results of seismic and <br />resistivity subsurface investigations, when they are readily available. <br />F. Preliminary design assumptions, operational aspects, tentative conclusions, and references. <br />The design assumptions shall pertain to such hydrologic features as drainage area, rainfall data, <br />runoff, inflow, area -capacity -elevation data, and flood routing, in addition to structural, geologic, <br />and geotechnical assumptions. <br />G. A preliminary cost estimate. <br />H. Where applicable, future plans on ultimate project size including dams and <br />impoundments. <br />I. A general description of all other activities and elements related to and part of the total <br />dam project, such as operational plans and details of smaller dams, dikes, diversions, reclaim water <br />facilities, and other facility and utility lines including pipelines, roads, and railroads. The report <br />shall identify each element or activity of the total dam project which would require a permit under <br />the provisions of parts 6115.0150 to 6115.0260. <br />Copyright © 2019 by the Revisor of Statutes, State of Minnesota. All Rights Reserved. <br />