My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/04/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 02/04/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:07:46 AM
Creation date
2/24/2021 11:30:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/04/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Setbacks when adjacent to <br /> <br />residential district <br />Buildings 60 feet Appears to comply Appears to comply <br />Off-street parking, storage <br />40 feet Appears to comply Appears to comply <br />areas, and driveways <br />Parking and pavement setback <br />20 feet Appears to comply Appears to comply <br />from street right-of-way <br />Maximum building height 65 feet Appears to comply Appears to comply <br />Maximum lot coverage 45 percent Appears to comply Appears to comply <br /> <br />Preliminary and Final Plat Process: <br />line, which would require a preliminary plat and final plat process. <br /> <br />Floodplains: The property is not within the Ramsey floodplain. <br /> <br />Wetlands: Wetlands and/or a required wetland setback appear to exist on a portion of the site. <br />Wetlands would be required to be identified on the site plan. <br /> <br />Streets and Access: Both concept plans propose 4 access points into the site; 3 along Bunker <br />Lake Blvd NW and 1 along the western property line. No streets are proposed for either concepts. <br /> <br />Landscape Plan: A landscape plan will be required with site plan review, which needs to include <br />a tree survey of the site. <br /> <br />Parking: Both concept plans appear to meet the required number of parking stalls. <br /> <br />Lighting: A lighting plan will be required with site plan review. <br /> <br />Grading: A grading plan will be required with site plan review. <br /> <br />Utilities and Municipal Services: A utility plan will be required with site plan review. <br /> <br />Development Fees: The Applicant will be responsible for paying for any development fees <br />associated with the project approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.