My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/07/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 01/07/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:07:36 AM
Creation date
2/24/2021 3:23:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/07/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
825 1. Purpose. To establish standards that protect water quality from pollutant loadings of sediment, <br />826 nutrients, bacteria, and other contaminants; and maintain stability of bluffs, shorelines, and other areas <br />827 prone to erosion. <br />828 2. Land alteration permit. <br />829 a. Within the bluff impact zone, land alteration is prohibited, except for the following which are <br />830 allowed by permit. <br />831 (1) Erosion control consistent with Section 117-148(j)6 (Conditions of land alteration permit <br />832 approval); <br />833(2)The minimum necessary for development that is allowed as an exception under Section 117- <br />834 148(l) (Exemptions); and <br />835 (3) Repair and maintenance of existing buildings and facilities. <br />836 b. Within the water quality impact zone, land alteration that involves more than ten cubic yards of <br />837 material or affects an area greater than 1,000 square feet requires a permit. <br />838 3. Rock riprap, retaining walls, and other erosion control structures. <br />839 a. Construction, repair, or replacement of rock riprap, retaining walls, and other erosion control <br />840 structures located at or below the OHWL must comply with Minnesota Rules, chapters <br />841 6115.0215, subpart 4, item E, and 6115.0216, subpart 2. Work must not proceed until approved <br />842 by the commissioner. See Figure 8. <br />843 <br />844 Figure 8. Riprap Guidelines <br />845 <br />846 b. Construction or replacement of rock riprap, retaining walls, and other erosion control structures <br />847 within the bluff impact zone and the water quality impact zone are allowed with a permit <br />848 consistent with provisions of Section 117-148(j)6 (Conditions of land alteration permit approval) <br />849 provided that: <br />850 (1) If the project includes work at or below the OHWL, the commissioner has already approved <br />851 or permitted the project. <br />852 (2) The structures are used only to correct an established erosion problem as determined by the <br />853 City of Ramsey. <br />24 12/30/2020 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.