My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/07/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 01/07/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:07:36 AM
Creation date
2/24/2021 3:23:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/07/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />existing <br />- <br />12/13/2019 <br /> <br />Commentary rock” in order to be consistent with the prepublic waters rules. <br />ty <br />50 feet landward <br /> <br /> <br />9 <br />, for agricultural use, <br />term watercraft mooring facilities for <br />- <br /> <br /> <br />individual trees or shrubs that are not in a <br />. <br />isolated <br /> <br /> <br />. <br />. <br />part of their function, are not shoreline facilities, such as <br /> <br />4 <br />The University of Minnesota, the St. Paul Port Authority, watershed <br />d under Minnesota Statutes, chapter 103B, watershed districts <br /> <br />e removal of <br />h <br />. See Figure <br />of land for commercial, industrial, or utility purposes, where access to and T <br /> <br /> <br />The use <br />and located between the ordinary high water level of public waters and a line parallel <br />acilities that require a location adjoining public waters for ingress and egress, loading <br />L <br />F <br />separation distance measured horizontally <br />A <br /> <br />impact zone. <br />dependent use. <br />. <br />- <br /> <br />Setback. <br />use of a public water feature is an integral part of the normal conduct of business and where the use is dependent on shoreline facilities.to it at a setback of 50 percent of the required <br /> structure setback orof the ordinary high water level Figure 4. Shore Impact Zone and unloading, and public water intake and outflow, such as barge facilities, port facilities, commodiloading <br /> and unloading equipment, watercraft lifts, marinas, shortpatrons, and water access ramps. Structures that would be enhanced by a shoreline location, but do not require a location adjoining <br /> public waters asrestaurants, bait shops, and boat dealershipsmanagement organizations establishe <br />contiguous patch, strip, row, or block and that does not substantially reduce the tree canopy or understory cover <br />RiverSelective vegetation removal. Shore Shoreline facilities. Special purpose units of government. <br /> <br />456 <br />83 <br />8182888 <br />2.6 <br />2.62.6 2.62.62.6 <br />Ordinance Language <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.