My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/07/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 01/07/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:07:36 AM
Creation date
2/24/2021 3:23:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/07/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />12/13/2019 <br />stormwater <br />the area in which <br />facilities would not be allowed. <br /> <br /> <br />Commentary 10.41. Optional. Could add the bluff setback to this standard to increase treatment <br /> <br />does <br />(insert <br />within the <br />WL <br /> <br />H <br />provisions <br /> <br />. <br /> <br />consistent with <br />except by permit if: <br /> <br />, <br /> <br />under Section 10.2 <br />31 <br /> <br />with a permit <br />prohibited <br />flood protection elevation. <br /> <br /> <br /> <br />g walls, and other erosion control structures above the O <br /> <br />ce agency). <br /> <br />: <br /> <br /> <br />, storm water management facilities are <br />provided it does not involve any land alteration <br /> <br /> <br />provided that <br /> <br />impact zone <br /> <br />iprap Guidelines10.6 <br />Retaining walls must not exceed five feet in height and must be placed a minimum horizontal distance of ten feet apart; andRiprap must not exceed the height of the regulatory <br />) ) <br />If the project includes work at or below the OHWL, the commissioner has already approved or permitted the project.The structures are used only to correct an established erosion problem <br /> as determined by the name of LGU and/or resourThe size and extent of the structures are the minimum necessary to correct the erosion problem and are not larger than the following, unless <br /> a professional engineer determines that a larger structure is needed to correct the erosion problem: <br />1 <br />((2 <br /> <br />Repair of existing rock riprap, retainin <br />Construction or replacement of rock riprap, retaining walls, and other erosion control structures <br />Figure 8. Rbluff impact zone and the water quality impact zone are allowed of Section <br />A.B.C.In the bluff <br />not require a permit <br /> <br />41 <br />. <br />10.33 <br />10.3210 <br />Stormwater management. <br /> <br />4 <br />. <br />10 <br />Ordinance Language <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.