My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/07/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 01/07/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:07:36 AM
Creation date
2/24/2021 3:23:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/07/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Created by <br />JoeFeriancekJoeFeriancekJoeFeriancekJoeFeriancekLenLintonLenLintonLenLinton <br />07/29/202007/29/202007/29/202007/29/202007/29/202007/29/202007/29/2020 <br />Markup Date <br />Markup Text <br />My understanding is this connection was going to be a road connection rather than a trail. A road connection would make the most sense in my opinion.The stub location does not appear <br /> to leave much buildable area on the north side of the road if the next parcel develops before the Solar Farm site developes.To give more comment to Tim's comment, it is not desirable <br /> for the City to have trunk utiliies, or any sanitary or water utilities in green space due to access/maintenance concerns.Do you have a plan with proposed house types, or not that far <br /> along yet? Are the townhomes planned to be slab on grade, spacing wise they appear close together to have a walkout type design.The project to the south showed stormwater overflow from <br /> their pond onto this site. The overflow route for this site must be called out on the preliminary plat.This muist be a full cul-de-sac, loosing the lots on either side of the stub <br /> until the next phase develops.The proximity of this stub to the south line of the solar farm limits future development until the solar farm is closed and the land redeveloped.Trunk <br /> Sanitary Sewer will require deducation of adequate drainage and utility easements. Layout may need to be changed to provide the necessary easements.A forcemain from the lift station <br /> will also be required which will require additional easement width. <br />Markup Name <br />JJFJJFJJFJJFLLLLLL <br />File Name <br />Riverstone South Sketch Plan.pdfRiverstone South Sketch Plan.pdfRiverstone South Sketch Plan.pdfRiverstone South Sketch Plan.pdfRiverstone South Sketch Plan.pdfRiverstone South Sketch <br /> Plan.pdfRiverstone South Sketch Plan.pdf <br />Current Project - Project Markups Listing <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.