My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/04/2021
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2021
>
Agenda - Planning Commission - 03/04/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:08:14 AM
Creation date
2/26/2021 9:52:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/04/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/25/2021 01:25 PM <br />Sketch Plan.pdf V1 - Changemark Notes ( 120 Notes ) <br />1 - Cul-De-Sac <br />Created by: Aaron Madsen <br />On: 02/12/2021 09:07 AM <br />need a temp sac <br />0 Replies <br />2 - ROW for CDS <br />Created by: Joe Feriancek <br />On: 02/22/2021 01:42 PM <br />Streets going off subject property north will need right of way sufficient for a cul-de-sac. A <br />temporary cul-de-sac will be required until the thru street is constructed. <br />0 Replies <br />3 - Density Transitioning <br />Created by: Chris Anderson <br />On: 02/22/2021 03:18 PM <br />Density transitioning is required along the rear lot lines of lots 103-111. See City Code Section <br />117-110 for specifics. <br />0 Replies <br />4 - Density Transitioning Encouraged <br />Created by: Chris Anderson <br />On: 02/22/2021 03:19 PM <br />We strongly encourage consideration of density transitioning along the rear lot lines of Lots 88-96 <br />and <br />0 Replies <br />5 - #1 Stormwater Pond Sizing <br />Created by: Len Linton <br />On: 02/23/2021 08:26 AM <br />Stormwater ponds must be sized to provide infiltration volume from the first 1 inch of runoff from <br />impervious area. <br />The infiltration basin bottom must be 3 feet above groundwater elevation. <br />Remove lots as necessary to provide the infiltration volume. <br />0 Replies <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.