My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council Work Session - 05/10/2005
Ramsey
>
Public
>
Minutes
>
Council Work Session
>
2005
>
Minutes - Council Work Session - 05/10/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 1:49:05 PM
Creation date
6/30/2005 8:36:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council Work Session
Document Date
05/10/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councihnember Elvig noted if Highway 47 were to be broadened to four lanes the trees on the <br />east side would likely need to be removed, which would eliminate the buffering. He suggested <br />this be looked at as a potential second phase. <br /> <br />Councihnember Cook suggested this could be possibly be resolved by shifting the plan 25 feet to <br />the east. He asked the developer about the possibility of salvaging some of the smaller trees for <br />the park across the highway. <br /> <br />Mr. Peterson replied this would not be a problem. <br /> <br />Councihnember Elvig asked if this plan will require a comprehensive plan amendment. <br /> <br />Associate Planner Geisler responded in the affirmative. She indicated the preliminary plat will <br />go to the Planning Commission in June with a comprehensive plan amendment request. <br /> <br />Counci hnember Elvig questioned if this development would utilize the secondary pipe. <br /> <br />Assistant Public Works Director Olson explained when the comprehensive sewer plan was <br />completed it was determined that there is not enough grade to service everything in the projected <br />area and a lift station is needed. It was determined it would be best to put the lift station in with <br />this development and forcemain it down along the east side of Highway 47 in the right-of-way. <br /> <br />2) Ramsey Town Center 8th, 9th and l0th Additions <br /> <br />Associate Planner Geisler indicated Ramsey Town Center, LLC has submitted sketch plans for <br />the 8th, 9"', and l0th Additions of Town Center, located north of Bunker Lake Boulevard and east <br />of Armstrong Boulevard. The entire site is approximately 46 acres. A sketch plan for this site <br />went to the Planning Commission at their February 3, 2005 meeting. She reviewed the following <br />information: <br /> <br />Town Center 8th Addition <br />This addition proposes a combination of small single-family lots and townhouse units. A private <br />street is proposed on the north side of this addition. Town Center Drive is on the east side of this <br />plat, and will be required to connect through to Town Center Gardens to the east. <br /> <br />Town Center 9th Addition <br />Thc 9th Addition proposes approximately 90 townhouse units served by private streets. A street <br />stub is shown in the northeastern comer of the plat that would connect to Pineview Estates. <br /> <br />Town Center l0th Addition <br />The l0th Addition proposes 44 small single family lots (approximately 6,600 square feet) served <br />by public streets; most of the loop around these lots is proposed to be a 50-foot right-of-way. <br /> <br />Associate Planner Geisler requested input from the Council regarding the general layout and <br />streets in the sketch plans. <br /> <br />City Council Work Session/May 10, 2005 <br /> Page 3 of 6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.