My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/26/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 01/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 11:37:59 AM
Creation date
3/2/2021 10:16:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL SPECIFICATIONS <br />Provide and construct/furnish 18" high x 105.25" wide x 1/2" thick rolled Cor-Ten steel <br />plate with water jet cut out copy "Loral I Armstrong Delaney" backed up with a rolled <br />1/8" stainless steel Panel with a mill finish and (3) 4" wide x 1/2" thick Cor-Ten steel <br />mounting plates as follows: <br />I/ We agree to furnish all materials, labor and site security to perform the work below. <br />• Mobilization and deliver the above reference monument addition to replicate the <br />existing sign, with the 'new' addition over the existing 'Central Park' panel. <br />• Quoted price must include detailed shop drawings for approval, manufacturing <br />and installation. <br />• This Request for Quotation shall be a lump sum amount, with no change orders, <br />unless upon mutual agreement, the City would add to the scope of the project. <br />Work and Staging Areas: <br />Confine work activities to the monument location, with care to minimize trampling of <br />the perennial plants and woody plants. Contractor is responsible for maintaining safe <br />job site conditions for the public at all times including when not present (E.g. overnight). <br />No construction activity shall be performed before 7 AM nor after 7 PM Monday through <br />Saturday. The contractor shall provide 72 hour advance notice before working on <br />Saturday. City Council approval is required for Sunday work. <br />A dumpster is not anticipated to be needed at the immediate site, and any construction <br />related disposal is to be hauled away, or placed in the existing dumpster, (and NOT trash <br />receptacles) at the park. <br />Liquidated Damages: <br />Liquidated damages shall be deducted from the approved quoted amount, in a sum of <br />$50 dollars per weekday (M-F) for non -completion after March 30th, 2021. <br />In submitting a quote, the Contractor Warranties the project shall be complete in ever <br />way and accepted by the City on or before the first Monday in April of 2021. <br />e a a a <br />21Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.