Laserfiche WebLink
In addition, Anoka County plans to construct interim improvements to Bunker Lake Boulevard between Armstrong <br />Boulevard and Sunfish Lake Boulevard starting on or after September 7, 2021. This corridor of Bunker Lake <br />Boulevard is proposed to receive significant trunk watermain improvements needed to serve the proposed water <br />treatment plant with raw water from the six municipal wells in The COR, and to deliver treated water to the <br />distribution system. In order to allow the trunk watermain improvements to be constructed along Bunker Lake <br />Boulevard in advance of Anoka County's interim Bunker Lake Boulevard improvements, which will save <br />significant project costs, the City must begin designing and preparing plans for the trunk watermain improvements <br />as soon as possible. If the City's watermain contractor and the County's highway contractor wanted to complete <br />work in the same area, the City's contractor would receive a lower priority and could face work delays, which could <br />cost the City many thousands of dollars per day. <br />Direct Selection of SEH, Inc. <br />In order to meet these timelines, Staff recommends direct selecting SEH Inc. to prepare final plans and <br />specifications for the required trunk watermain improvements and provide project bidding services. Upon <br />acceptance of bids and award of a contract, Staff would then recommend direct selecting SEH Inc. to provide <br />construction services. See the attached proposal for more details on work tasks, staffing, estimated hours and costs, <br />and project schedule. Any time a consultant prepares project plans and specifications, Staff recommends using that <br />consultant for construction services because they will be the most efficient at translating information from the plans <br />to the field, especially as related to staking construction and applying specifications in the field. <br />Staff understands Council generally prefers to solicit requests for proposals from multiple vendors, especially for <br />larger projects such as this. However, Staff believes it is in the City's best interest to direct select SEH, Inc. to <br />prepare plans and specifications, to assist in bidding the plans, and to provide construction services as outlined in <br />the attached proposal to ensure the watermain improvements can be constructed in advance of the Anoka County <br />improvements along Bunker Lake Boulevard. <br />SEH's proposed design services fee is $235,895, which equates to 6.89-percent of the estimated trunk watermain <br />improvements construction cost of $3,424,750. Considering the scope and complexity of the trunk watermain <br />improvements proposed with this project, Staff would anticipate receiving design services proposal fees in the range <br />of 7 to 12-percent. The proposed design services fee is therefore reasonable and Staff would not anticipate receiving <br />other proposals with significantly smaller fees, if at all. <br />SEH's proposed construction services fee is $144,947, which equates to 4.23-percent of the estimated construction <br />cost. Again, considering the scope and complexity of the trunk watermain improvements proposed with this project, <br />Staff would typically anticipate receiving construction services proposal fees in the range of 6 to 11-percent. The <br />proposed construction services fee therefore seems very reasonable and Staff would not anticipate receiving a <br />proposal other proposals with significantly smaller fees. <br />Staff will highlight and summarize this information during their presentation to Council. <br />Notification: <br />Notifications are not required for this item. <br />Observations/Alternatives: <br />Observations: <br />Per the preliminary project schedule in the attached proposal, if Council orders plans and specifications on March <br />9th, Staff anticipates requesting approval of plans and specifications and authorization to advertise for bids on June <br />29, 2021. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #21-061 Ordering Plans and Specifications for Improvement Project <br />#21-08, Water Treatment Plant Trunk Watermain Improvements. <br />Alternative #2 — Motion of other. <br />