My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/09/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:54:15 PM
Creation date
3/9/2021 3:59:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/09/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SEH <br />Building a Better World <br />for All of Us® <br />March 2, 2021 <br />Mr. Bruce Westby <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Dear Mr. Westby: <br />RE: Proposal for Professional Design Services <br />Central WTP Water Systems Connection <br />SEH No. RAMSY P-159310 14.00 <br />The City of Ramsey is seeking a consultant to provide engineering services for the construction of the water <br />distribution system to connect the future Central Water Treatment plant and existing municipal wells. This <br />project will result in critical improvements to the existing water infrastructure to serve increasing water demand <br />and the need for water treatment. Our team has identified the following aspects of the project that will be key <br />to its success: <br />• Coordination with the Anoka County public works Bunker Lake Boulevard NW Improvement project. <br />• An early assessment of right-of-way and easement acquisition if necessary and private utility impacts to <br />avoid project delays <br />• Providing clear project management to meet deadlines and scheduling of the work to happen for 2021 <br />construction. <br />• Minimizing disturbed areas by utilizing methods of trenchless utility installation where feasible. <br />Short Elliott Hendrickson Inc. (SEH®) has intentionally formed our team to provide the right experience and <br />technical knowledge to address these critical success factors and make this water systems connection project <br />a success. This proposal is based on conversations with City staff, a project drive through and our knowledge <br />of similar projects. We are confident the team and approach outlined here will lead to smooth project delivery. <br />PROJECT UNDERSTANDING <br />The City of Ramsey is proactively planning to build a new water treatment plant to serve the community with <br />clean drinking water. The construction of the new plant requires additions to the existing water systems to <br />route raw water from the City's existing and future wells for treatment. <br />There are many technical and procedural challenges associated with this project that will need to be <br />addressed: <br />• Providing timely coordination and meeting design standards required to obtain necessary permits <br />• Communicating with adjacent property owners and Anoka County <br />• Working within the limited Anoka County right-of-way limiting impacts to the roadway on Bunker Lake <br />Boulevard NW (CSAH 116) <br />• Coordinating necessary project right-of-way acquisition, temporary easements and/or right of entry <br />• Identifying, evaluating, and determining solutions for trenchless utility design based on Geotechnical <br />findings <br />• Coordinating with utility companies to identify potential conflicts and resolutions <br />Engineers I Architects I Planners I Scientists <br />Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-3507 <br />651.490.2000 1800.325.2055 1888.908.8166 fax I sehinc.com <br />SEH is 100% employee -owned I Affirmative Action —Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.