Laserfiche WebLink
m <br />X <br />w <br />Prepared by: Justin R. Bergerson <br />Central WTP Water Systems Connection <br />City of Ramsey, MN <br />SEH Project # P -159310 <br />March 2, 2021 <br />�i O <br />N <br />N <br />LC, <br />O <br />O N <br />O M <br />N N <br />CO <br />01 C� <br />N O <br />Cfl <br />CO1N <br />I. <br />I. <br />CO �G <br />N <br />CD CO <br />N C <br />= d <br />$ 270.68 <br />1 <br />$ 871.00 <br />U � <br />N , <br />N CO <br />co co <br />01 <br />a> <br />m> <br />00 N <br />CO <br />P <br />W <br />a <br />L <br />0 <br />d <br />co <br />Ln <br />”? <br />_ <br />O <br />4 M <br />O N <br />N <br />11 <br />d <br />y:a <br />a <br />v O <br />Preconstruction meeting agenda, attendance, minutes <br />Review shop drawings <br />Create field quantity book <br />Create application for payment forms <br />Reproductions of construction documents <br />§- d <br />O 7.0+O+ <br />onstruction Administratio; <br />Project management <br />Engineering Support <br />Construction meetings (Assumed 8 meetings) <br />Pay applications <br />Materials testing coordination <br />Newsletter updates <br />O d <br />2 LL <br />Construc''ien a mg <br />Create stakeout file / point files <br />Stake Right of Way and Easements <br />Construction Limits & Silt Fence <br />Water Main <br />Trails and Walks <br />Pedestrian Ramps <br />Mileage and Survey Equipment Expenses <br />O y <br />2 LL <br />1 <br />+O+ <br />