Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />November 18, 2020 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Engineering Services — 2021 Riverdale Drive Improvement Project — Feldspar Street <br />to Tungsten Street <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for the Riverdale Drive Improvement <br />project. Our scope and fees were prepared based on our understanding of the project and our previous <br />experience in delivering State Aid projects. <br />The following proposal is based on your November 17, 2020 email request, including the layouts attached <br />to the email. <br />SC , PE <br />The proposed improvements will be generally as described below: <br />• Riverdale Drive reconstruction from Feldspar Street to 750 feet west of Sunfish Lake Boulevard, <br />• Mill & overlay of Riverdale Drive from 750 feet west of Sunfish Lake Boulevard to Tungsten <br />Street, <br />• Construction of a 10 ft wide bituminous trail from Feldspar Street to 300 feet east of Dolomite <br />Street, <br />• Construction of a 6 ft sidewalk from Feldspar Street to Dolomite Street, <br />• Adjustments of fire hydrants, as needed, <br />• Exposing of water services to verify they are properly restrained, and <br />• Storm sewer facilities at various locations along Riverdale Drive. <br />Attached are the figures received from the City of Ramsey depicting the proposed improvements. <br />Project scope assumptions used in creating this fee proposal include the following: <br />• A topographic survey of the corridor was completed by the City of Ramsey. We have assumed <br />the City will forward information related to the survey control points to us for reference. We have <br />estimated an additional augmentation survey will be required during design. <br />• Geotechnical borings will be required for the project. A total of 4 borings, along with 3 <br />bituminous corings, will be completed along the corridor. We are proposing to use AET for the <br />geotechnical evaluation. <br />• No Right -of -Way or easements will be required for the project. <br />Bolton 8 Menk is an equal opportunity employer. <br />