My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/09/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:54:15 PM
Creation date
3/9/2021 3:59:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/09/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />March 3, 2021 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Related Services — 2021 Riverdale Drive Improvement Project — <br />Feldspar Street to 140 Feet West of Sunfish Lake Boulevard <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for the Riverdale Drive Improvement <br />project. Our scope and fees were prepared based on our understanding of the project and our previous <br />experience in assisting the City of Ramsey with similar project types. Our proposed services will be as <br />described below: <br />Contract Preparation — Assist with Notice of Award, Contracts, and Notice to Proceed. Prepare sets of <br />contract documents (plans and specifications) for City and Contractor. <br />Pre -Construction Conference — Attend Pre -Construction Conference to address questions that may arise <br />related to project design or construction staking. <br />Shop Drawing / Submittal Review — Review submittals for key project components. <br />Construction Staking — Includes setting survey control and staking curb, storm sewer, fire hydrants, <br />pedestrian curb ramps, and trail. <br />Pay Application Assistance — Work with City and Contractor to complete payment documents. <br />As -Built Survey and Record Drawings — Survey key project components after completion of <br />construction and prepare of Record Drawings. <br />Construction Revisions / Plan Updates — To be performed as needed during construction. We have <br />assumed a total of 26 hours for this task. We will not invoice for this task unless requested by City. <br />We have attached a fee spreadsheet depicting hours, rates, and total compensation on a per task basis. Our <br />proposed Not -To -Exceed fees for the work are $21,682.00. <br />If there are any questions related to this proposal, please call me at (651) 968-7760. <br />Sincerely, <br />Bolton & Menk, Inc. <br />)4/4-- )5),e_ <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Bolton 8 Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.