My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/16/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 03/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:32:31 AM
Creation date
3/11/2021 3:59:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 5.2. <br />Meeting Date: 03/16/2021 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Consider Recommending City Council Approval of Plans and Specifications and Authorization to Advertise for <br />Bids for Business Park 95 Street Reconstructions, Improvement Project #21-03 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council approval of plans and specifications and <br />authorization to advertise for bids for Improvement Project #21-03, Business Park 95 Street Reconstructions. <br />Background: <br />City Improvement Project 21-03 proposes to reconstruct the streets within the Business Park 95 subdivision in 2021 <br />including; 140th Avenue, McKinley Street, Radium Street and Unity Street. The streets total approximately 6,314 <br />lineal feet (1.20 miles) in length. The title sheet on the attached plans shows the overall project scope graphically. <br />On December 8, 2020, the Ramsey City Council approved the 2021 — 2030 Capital Improvement Program, which <br />identifies the streets in Business Park 95 for reconstructions in 2021. <br />On February 24, 2020, the Ramsey City Council indefinitely suspended the annual sealcoat program and <br />reallocated $250,000 of the budgeted 2020 sealcoat funds for pavement overlay improvements in the Business Park <br />95 subdivision since the streets within Business Park 95 are prematurely deteriorating due to pavement stripping, <br />which is the driving force for suspending the annual sealcoat program. <br />In February 2020, Staff hired WSB to perform a pavement forensics analysis, which included the extraction of <br />pavement cores from each street segment proposed to receive overlay improvements in Business Park 95. Based on <br />WSB and Associates pavement forensics analysis, it was found that the deterioration of the streets in Business Park <br />95 were beyond the scope of overlay improvements. WSB's report solidified Staff's recommendation not to overlay <br />the streets within Business Park 95 in 2020. The WSB report is attached to this case. <br />On March 16, 2020, the Public Works Committee supported Staff s conclusions and recommendations that the <br />proposed Amended 2020 Pavement Overlay Improvements, including Business Park 95, were not feasible or <br />cost-effective from an engineering standpoint, and that the overlay improvements as proposed should not be <br />completed in 2020. <br />On November 10, 2020, the Ramsey City Council authorized Staff to execute proposals from Bolton & Menk for <br />topographic survey work, and from Chosen Valley Testing (CVT) for geotechnical evaluation work, both of which <br />are required to complete the project design and prepare plans and specifications. The CVT Geotechnical Report is <br />attached to this case. The geotechnical report generally found clean sand below the existing bituminous and gravel <br />pavement sections. <br />On December 8, 2020, the Ramsey City Council authorized Staff to execute proposals from Nelson Sanitation & <br />Rental, Inc. for televising the sanitary sewer and storm sewer within the project area, and from Water Conservation <br />Services, Inc. for leak testing watermain within the project area. <br />The watermain leak test results indicated that all of the watermain is in good condition and does not need repairs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.