My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/16/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 03/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:32:31 AM
Creation date
3/11/2021 3:59:52 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VUS <br />To: Joe Feriancek, PE <br />From: Andrea Blanchette, PE <br />Tom Wood <br />Sheue Torng Lee <br />Date: March 4.2U2D <br />Re: Pavement Coring Forensic Report <br />City ofRamsey <br />WSB Project No. 015656-000 <br />Introduction <br />WSB is pleased to submit this pavement forensics report detailing the results of the pavement <br />coring which was completed onMarch 2.2020inthe City ofRamsey. The various characteristics <br />of the pavement cores were summarized to provide information to the City to assist in <br />determining the appropriate pavement maintenance or rehabilitation method for the roadways. <br />Atotal of8(6 of which were taken inapatched area) pavement cores were obtained inthe <br />Business Park 95 Project Area and a total of 12 cores were obtained in the Regency Pond <br />Project Area. The locations of the pavement cores are summarized in Figure 1 and Figure 3. A <br />summary of the pavement depths and conditions for the streets are shown in Table 1. Pictures of <br />the cores obtained can hafound inthe Appendix. <br />
The URL can be used to link to this page
Your browser does not support the video tag.