Laserfiche WebLink
0 <br />N <br />0 <br />Z <br />U <br />U <br />U <br />a <br />q <br />w <br />Z <br />m <br />W <br />2 <br />Z <br />2 <br />0 <br />N <br />CO <br />0 <br />0 <br />❑ <br />z <br />0 <br />U <br />LOG OF BORING <br />CHOSEN VALLEY TESTING <br />CVT <br />PROJECT: 17624.20.MNS <br />Design Phase Geotechnical Evaluation <br />Proposed Business Park <br />Unity Street NW <br />Ramsey, Minnesota <br />BORING: B-1 <br />LOCATION: <br />See attached sketch <br />DATE: I1/24/2020 <br />SCALE: 1" = 2' <br />Elev. <br />865.5 <br />De th <br />p <br />0.0 <br />USCS <br />Symbol <br />Description of Materials <br />(ASTM D 2487/2488) <br />BPF <br />WL <br />Tests and Notes <br />865 3 <br />0 7 <br />1.5" BITUMINOUS <br />15 <br />11 <br />10 <br />8 <br />1 5" RECYCLED BITUMINOUS <br />865 <br />0 1 <br />S <br />POORLY GRADED SAND with SILT, mostly fine <br />to medium grained, trace gravel, brown, moist, loose <br />to medium dense. <br />(Possible Fill) <br />- <br />854.5 <br />— <br />_ <br />11.0 <br />_ <br />End of boring. <br />Water not encountered during drilling <br />Boring sealed upon completion. <br />17624.20.MNS <br />B-1 page 1 of 1 <br />