Laserfiche WebLink
Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• UPDATE Construction proposed for 2023, pending City & County approvals <br />• CSAH 116 Interim Improvements <br />• Anoka County revised concept level layout per Resolution #21-044 comments <br />• Virtual Open House March 1 lth — 25th @ www.bunkerlakeproject.com <br />• Construction proposed to begin September 7, 2021 <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes in 2021 to improve operations and safety <br />• Forest Lake Contracting awarded the construction contract <br />• Preconstruction meeting to be conducted March 19th <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 - 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design still on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve, which would require the relocation <br />of Alter Recycling <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 - 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 - 2023 <br />• NW Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES funded 100% using Clean Water Funds <br />• Study findings to be presented in April or May <br />• City of Ramsey Centralized Water Treatment Plant Feasibility Study <br />• Feasibility Study is complete <br />• Executing contract with SEH, Inc. to prepare plans and specifications for trunk watermain <br />improvements <br />• City Council to review project delivery options for Water Treatment Plant at a work session in March <br />or April <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary design for grade -separation of Ramsey Blvd. and Sunfish Lake Blvd. is underway <br />• Approximately $84M in project funding has been secured <br />• Remaining funding continues to be pursued <br />• Public Open House held February 18, 2021 <br />• NW Metro Mississippi River Crossing Feasibility Analysis <br />• No updates at this time <br />• TH 47 Safety Study <br />• Staff plans to provide an update at the May PWC meeting <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Staff continues to monitor actions in other cities <br />• Staff plans to provide an update in May or June <br />