My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/23/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 03/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:55:46 PM
Creation date
3/30/2021 10:02:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/23/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
970
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The storm sewer televising showed that more than half of the storm sewer was plastic pipe, and that much of the <br />smaller diameter plastic pipe needed to be replaced. In addition, several hundred feet of concrete storm sewer <br />needed to be replaced. This cost was not accounted for in the CIP storm sewer cost estimates, which significantly <br />increased project costs. <br />In 2020, Business Park 95 was included in the Ground Penetrating Radar Pavement Evaluation performed by Braun <br />Intertec. This data provides bituminous and aggregate base thickness information. The Ground Penetrating Radar <br />(GPR) data is included in the street segment summary attached to this case. <br />The Business park 95 subdivision is a commercial subdivision with heavy truck traffic. During the fall of 2020, <br />Staff took traffic counts with annual daily traffic (ADT) volumes of; 846 on Unity Street south of Bunker Lake <br />Boulevard, and 2,245 on McKinley Street east of Sunfish Lake Boulevard. The City does not have a standard <br />commercial pavement section, however, since these roads must be open during all seasons to heavy truck traffic, the <br />streets are proposed to be reconstructed to a 9-ton design using MnDOT's design guidelines. Based upon pavement <br />coring's, the existing pavement section meets a 9-ton design. The existing concrete curb and gutter is generally in <br />good condition and will be lerft in place to the maximum extent possible. <br />The streets are proposed to be reconstructed using the full -depth reclamation process. This includes reclaiming the <br />existing pavement and aggregate base section, removing the top 4-inches of reclaim, and then compacting the <br />remaining 6-inches of material in place to serve as aggregate base. Then 4-inches of new bituminous pavement is <br />proposed to be placed on top to effectively provide a 10-inch minimum pavement section, meeting a 9-ton design <br />strength. <br />The pavement on the east end of McKinley Street ends approximately 450-feet east of Radium Street, after which it <br />becomes a gravel surface for approximately 75-feet before turning into a private driveway. This leaves no space <br />within public right of way for snow plows or emergency vehicles to turn around. The plans include an alternate bid <br />for extending the pavement on McKinley Street approximately 250-feet east, and constructing a paved cul-de-sac <br />on the east end within existing right-of-way. The cul-de-sac extension is supported by the Public Works <br />Department and Fire Department. This cul-de-sac extension would have the added benefit of providing better <br />access to an existing trunk sanitary sewer line which exists in green space east of McKinley Street. Bidding the <br />cul-de-sac extension as an alternate bid will allow the City Council to know the bid price before deciding whether <br />to construct the cul-de-sac extension. Attached is the plan sheet showing the scope of this alternate bid work. <br />Approximately 450-feet of the west end of McKinley Street is proposed to be left as is as this segment will be <br />reconstructed with the Sunfish Lake Boulevard & BNSF Railway grade separation improvements, part of the <br />Ramsey Gateway Highway 10 Improvements project. The construction limits on the west end of McKinley Street <br />were designed to match the tie down location for the segment of McKinley Street to be reconstructed with the <br />Ramsey Gateway Improvements to avoid "throw away" costs. The elevation of Sunfish Lake Boulevard at <br />McKinley Street will be about 20-feet higher when the Sunfish Lake Boulevard & BNSF Railway grade separation <br />improvements are complete. <br />The base bid improvements proposed with this project are identified in the City's current 10-year CIP, and can be <br />funded using a combination of Pavement Management Funds, Stormwater Utility Funds, and previously budgeted <br />funds. The alternative bid is proposed to be funded with the Public Improvement Revolving Fund. <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to <br />prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding software <br />used by the City of Ramsey. This ensures that all bidders are bidding off the same set of plans, and that all bidders <br />are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet from the <br />plans showing the scope of the improvements, as well as a plan sheet showing the typical sections, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Staff proposes to open bids on April 19, 2021, and to present the bid results to City Council on April 27, 2021 for <br />award of a construction contract to the lowest responsible bidder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.