My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/23/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 03/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:55:46 PM
Creation date
3/30/2021 10:02:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/23/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
970
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 03/23/2021 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />5. 16. <br />Title: <br />Adopt Resolution #21-074 Approving Plan and Specifications and Authorizing Advertisements for Bids for 2021 <br />Neighborhood Pavement Overlay Improvements, Improvement Project #21-04 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-074 Approving Plans and Specifications and Authorizing <br />Advertisements for Bids for 2021 Neighborhood Pavement Overlay Improvements, Improvement Project #21-04. <br />Background: <br />Overlaying the streets identified within the 2021 — 2030 Capital Improvement Program for 2021 will allow the City <br />to maintain these streets in the most cost-effective manner throughout the serviceable life of the streets. <br />Exhibits are attached showing the specific street segments proposed to receive bituminous pavement overlay <br />improvements in 2021. These street segments are located in the following developments: <br />• Birch Hill Lodges <br />• Ferrum 1st & 2nd <br />• Gateway Industrial Park <br />• Mallard Ponds <br />• Northfork Itasca Point <br />• Northfork St. Andrews <br />• Oakridge Industrial Park <br />• Rabbit Run <br />• Ramsey Meadows 2nd <br />A street segment summary is attached. The proposed project is 1.81 miles in total length. <br />On January 12, 2021 the Ramsey City Council adopted resolution #21-011, ordering Staff to prepare plans and <br />specifications for improvement project #21-04, 2021 Neighborhood Pavement Overlay Improvements. Staff has <br />prepared plans and specifications in-house, as part of their normal duties. <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to <br />prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding software <br />used by the City of Ramsey. This ensures that all bidders are bidding off the same set of plans, and that all bidders <br />are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet from the <br />plans showing the scope of the improvements. Plans are available upon request from the City Engineer. <br />Staff proposes to open bids for this project on April 19, 2021, and to present the bid results to the City Council on <br />April 27, 2021 for award of a construction contract to the lowest responsible bidder. <br />The proposed improvements are designated as City Improvement Project #21-04, 2021 Neighborhood Pavement <br />Overlay Improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.