My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/23/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 03/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:55:46 PM
Creation date
3/30/2021 10:02:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/23/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
970
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />Background + Purpose <br />Overview <br />The purpose of the Center Street Area Framework + Policy Plan is to advance the planning <br />activity for several interrelated projects within this district. Several of these project have <br />timelines that require the work to commence as soon as possible. A summary list of current <br />and potential future projects includes: <br />• Center Street sidewalk(s) in front of the Sapphire building; <br />• Center Street streetscape/trail (west side) near the interface of the Affinity and Municipal <br />Plaza; <br />• Municipal Plaza (north) at the interface with Affinity; <br />• Municipal Plaza (south) the larger Happy Days site; <br />• Pump House Plaza the area immediately surrounding the small Pump House No. #3; <br />• Pump House Exterior potential facade improvements; <br />• 145th Avenue sidewalk connecting to Center Street. <br />p.a <br />p4. <br />' 4%., 'max <br />•�- <br />• <br />1 <br />7 <br />Elunkor take $puipoird <br />The Watev rolnt <br />(future l <br />Affinity <br />DevelS?pm. nt <br />Puttee <br />DrveIopfn-rnl p <br />r <br />Municipal <br />Plata <br />r tfutuee) <br />�r t� <br />Rank yr Rbrkwryr <br />The <br />' draw <br />Sapphire:' <br />[eweloprnen <br />,wrietr ranitru <br />1 <br />�'UMp <br />house - <br />Future <br />prior. pmrat <br />Su nw .ct arr. <br />Outcomes + Deliverables <br />As indicated, the above project listing is <br />merely a summary outline of the work to be <br />performed; the detailed Scope of Services <br />(provided by the Consultant Team), will <br />result in design guidelines to allow the city <br />to develop specifications (cross -sections <br />with details) such that quotations may be <br />sought for work that must be completed <br />like the sidewalk/streetscape adjoining the <br />Sapphire building. Additionally, the scope <br />and cost of other features may be better <br />understood, and accordingly, will result in <br />the ability to proceed with improvements to <br />Municipal Plaza, and the Pump House site <br />(plaza, concrete, landscaping and conceiv- <br />ably an attached public restroom), at such <br />time it is authorized by City Council, (in <br />2021 or thereafter). <br />Further, the above referenced Scope of <br />Services will develop the design for the <br />Pump House facade and related <br />architectural treatments, and result in a <br />Design -build RFP that will provide City <br />Council with the cost and contractor (upon <br />approval) that can complete the 2020 <br />Capital Improvement Project for Municipal <br />Pump House #3. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.