Laserfiche WebLink
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br /> <br />Date 3/31/2021 Project Site PID: Bacon Property <br />Project Title 20-138 Bacon Subdivision <br />Escrow # <br />Department: Community Development: Planning Division <br />Technical Name: Chloe McGuire <br />Reviewer: Phone: 763-433-9821 <br />Email: cmcguire@cityoframsey.com <br /> <br />Required Steps <br />1.!Free Pass <br />2.!Sketch Plan Planning Commission <br />3.!Site Plan Planning Commission + City Council <br />4.!Final Plat City Council <br />Site Plan Review <br />Notes: <br />!Please see ProjectDox (electronic plan review) comments from Staff. <br />!Seems to meet R-1 Rural Developing standards <br />Comprehensive Plan: The property is currently guided as Rural Developing in the 2040 Comprehensive <br />Plan. This designation would allow for larger lots on private well and septic. <br />Zoning: The site is currently zoned as R-1 Rural Residential. This allows for 2.5 acre lots on well and <br />septic. <br />Number of Lots: 9 Lots. <br /> <br />R-1 Residential (MUSA) Single Family Detached Standards <br />Standard Required Proposed <br />Minimum Lot Size 2.5 acres 2.5 acres + <br />Minimum Lot Width 200 feet 200 feet/100 feet on cul- <br />de-sac <br />Minimum Buildable Acreage (net) 1 acre All >1 acre <br />Density Transitioning Required when abutting less N/A <br />dense developments. <br />Maximum Lot Coverage (All 35% N/A. Appears it will meet <br />Buildings, Excludes Paving) requirement. <br /> <br />