Laserfiche WebLink
March 9, 2021 <br />Page 3 <br />This is reviewed at time of Building Permit Application and request for Certificate of Occupancy <br />for each individual lot. <br /> <br />Lighting <br />Plans show downcast shield lighting attached to the proposed building. This style of downcast <br />lighting is consistent with zoning. <br /> <br />Building Elevations <br />Color building elevations have not been provided. Generally speaking, the black and white <br />elevations provided as part of the current submittal appear to meet zoning district requirements. <br /> <br />Parking/loading areas <br />Per the city code, one parking stall is required for every 300 square feet of office space or one <br />parking stall per 1,000 square feet of industrial space. The site plan shows a 72,000 square foot <br />building with 135 parking stalls, six (6) of which are shown as handicapped stalls. 100% industrial <br />uses would require a total of 72 spaces whereas 100% office use would require a total of 240 <br />parking spaces. The 135 proposed spaces are more than is required for industrial but less than <br />for office. Staff anticipates a mixture of office/warehouse space and as such it is Staff’s opinion <br />that the proposed number of parking spaces is sufficient. <br /> <br />Septic/Drainfield <br />The current plan proposes connection to city utility services and as such, no septic systems or <br />drain fields are proposed. <br /> <br />Trash Enclosure <br />Exterior trash enclosure proposed to be constructed of 8” rockface concrete block painted to <br />match principal structure. Block will be capped with a metal cap flashing over treated plate. <br />Doors of enclosure are proposed to be vertical composite wood siding over tube steel door <br />frames. <br /> <br />Next Steps <br />The developer will be required to enter into a Development Agreement with the City to ensure the <br />timely construction of required improvements. The Development Agreement will also require a <br />financial surety in the amount of 125% of the cost of required improvements. The financial surety <br />shall be in the form of a Letter of Credit or cash escrow only. The Development Agreement will <br />also require an Engineering Inspection Fee of 5% of the cost of required improvements. The <br />escrow must be in the form of a cash escrow. The City will prepare a draft Development <br />Agreement for your review once an engineer’s estimate has been provided by the Applicant. <br />Bunker Lake Industrial Park Building #4 <br /> <br />