My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/13/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:56:29 PM
Creation date
4/15/2021 11:12:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/13/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Surface water flow direction and storm water pipe water flow direction shall be <br />indicated on the pre and post project watershed maps. <br />• Minimum recommended watershed map scale is 1" =100'. Project applications <br />submitted with smaller scales (e.g., 1"=500') may be rejected and returned to the <br />applicant. The same would apply for project watershed maps that do not include <br />topographic contours or basic land use information such as the location of <br />buildings, pavement and "green space". Watershed maps submitted as pdf files or <br />CAD files shall be readily printable at scales that allow for good readability. <br />• Pre and post project watershed maps shall be clearly linked to the drainage <br />models such that the names of the sub -watersheds, ponds and drainage structures <br />are the same in the models as shown on the watershed maps. In addition, <br />watershed and sub -watershed boundaries shall be clearly shown. <br />• Submission of the actual pre and post project HydroCAD or XPSWMM models is <br />required: pdf copies of the drainage model simulations are unacceptable. In the <br />event that the models cannot be transferred readily by electronic mail or electronic <br />repository site, a hardcopy CD shall be provided. <br />• Curve numbers shall be determined per NRCS methodology and should be <br />modified as needed based upon detailed knowledge of soil type and specific <br />conditions on site. HydroCAD modeling software includes NRCS guidance for <br />determining curve numbers based upon land use and condition. <br />• Time of concentration (Tc) computations and assumptions that in MnDOT's <br />assessment clearly overestimate or underestimate this critical runoff parameter <br />will be rejected. Two common assumptions that lead to overestimating Tc <br />include: using the "Lag/CN" method to determine peak runoff from watersheds <br />that have a relatively long and/or diverse flow path, and assuming that sheet flow <br />occurs for a distance exceeding100 feet. Conversely, pre -project Tc shall not be <br />underestimated to offset post project increases in peak discharge. <br />• Available freeboard for existing and proposed treatment ponds shall be shown on <br />the watershed maps as well as the normal and 100-year high water levels. All <br />proposed pond treatment systems along MnDOT right-of-way shall have a <br />minimum freeboard of 2.0 feet between the road surface and the proposed <br />100-year HWL. <br />• Infiltration basins, filtration basins and ponds adjacent to MnDOT right-of-way <br />shall be designed to provide at least 2 feet of elevation difference between the <br />100-year HWL and the crest of the basin berm. The berm crest shall be at least 5 <br />feet wide. The emergency overflow shall be lined from crest to toe of slope with <br />Turf Reinforcement mat or Category 6 or 7 Erosion Control Blanket. <br />April 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.