Laserfiche WebLink
216 bu. Setback. A separation distance measured horizontally. <br />217 <br />218 <br />219 <br />220 <br />221 <br />222 <br />223 bw. Shoreline facilities. Facilities that require a location adjoining public waters for ingress and egress, <br />224 loading and unloading, and public water intake and outflow, such as barge facilities, port <br />225 facilities, commodity loading and unloading equipment, watercraft lifts, marinas, short-term <br />226 watercraft mooring facilities for patrons, and water access ramps. Structures that would be <br />227 enhanced by a shoreline location, but do not require a location adjoining public waters as part of <br />228 their function, are not shoreline facilities, such as restaurants, bait shops, and boat dealerships. <br />229 bx. Special purpose units of government. The University of Minnesota, the St. Paul Port Authority, <br />230 watershed management organizations established under Minnesota Statutes, chapter 103B, <br />231 watershed districts established under Minnesota Statutes, chapter 103D, and any other unit of <br />232 government other than local government or a state or regional agency. <br />233 by. State or regional agency. The Metropolitan Airports Commission, Minnesota Historical Society, <br />234 University of Minnesota, Department of Natural Resources, Department of Transportation, <br />235 Metropolitan Council and other state agencies. <br />236 bz. Steep slope. A natural topographic feature with an average slope of 12 to 18 percent, measured <br />237 over a horizontal distance equal to or greater than 50 feet, and any slopes greater than 18 <br />238 percent that are not bluffs. <br />bv. Shore impact zone. Land located between the ordinary high water level of public waters and a line <br />parallel to it at a setback of 50 percent of the required structure setback or, for agricultural use, <br />50 feet landward of the ordinary high water level. See Figure 4. <br />Figure 4. Shore Impact Zone <br />Shore <br />impact zone <br />(50% of structure <br />setback) <br />Shore Impact Zone <br />Water <br />\\\ Structure <br />setback <br />n r._.- OHWL <br />239 ca. Storm water management facilities. Facilities for the collection, conveyance, treatment, or disposal <br />240 of storm water. <br />241 cb. Structure. A building, sign, or appurtenance thereto, except for aerial or underground utility lines, <br />242 such as sewer, electric, telephone, or gas lines, and utility line towers, poles, and other <br />243 supporting appurtenances. <br />244 cc. Subdivision. Having the meaning given under Minnesota Statutes, section <br />245 cd. Subsurface sewage treatment system. Having the meaning given under Minnesota Rules, part <br />246 <br />247 ce. Transmission services. <br />7 <br />