Laserfiche WebLink
J <br />ti) <br />cn <br />4.1 <br />V <br />�O <br />L <br />a <br />0 .4) <br />ff <br />is— <br />V <br />Created by <br />Joe <br />Feriancek <br />Joe <br />Feriancek <br />Joe <br />Feriancek <br />Joe <br />Feriancek <br />Len <br />Linton <br />Len <br />Linton <br />Len <br />Linton <br />Markup Date <br />07/29/2020 <br />07/29/2020 <br />07/29/2020 <br />07/29/2020 <br />07/29/2020 <br />07/29/2020 <br />O <br />N <br />O <br />N <br />01 <br />N <br />N <br />O <br />Markup Text <br />My understanding is this connection was going to <br />be a road connection rather than a trail. A road <br />connection would make the most sense in my <br />opinion. <br />The stub location does not appear to leave much <br />buildable area on the north side of the road if the <br />next parcel develops before the Solar Farm site <br />developes. <br />To give more comment to Tim's comment, it is not <br />desirable for the City to have trunk utiliies, or any <br />sanitary or water utilities in green space due to <br />access/maintenance concerns. <br />Do you have a plan with proposed house types, or <br />not that far along yet? Are the townhomes <br />planned to be slab on grade, spacing wise they <br />appear close together to have a walkout type <br />design. <br />The project to the south showed stormwater <br />overflow from their pond onto this site. The <br />overflow route for this site must be called out on <br />the preliminary plat. <br />This muist be a full cul-de-sac, loosing the lots on <br />either side of the stub until the next phase <br />develops. <br />The proximity of this stub to the south line of the <br />solar farm limits future development until the solar <br />farm is closed and the land redeveloped. <br />Trunk Sanitary Sewer will require deducation of <br />adequate drainage and utility easements. Layout <br />may need to be changed to provide the necessary <br />easements. <br />A forcemain from the lift station will also be <br />required which will require additional easement <br />width. <br />Markup Name <br />L.L <br />-I-I-I1-11-11-11-1-I-IJ <br />File Name <br />Riverstone South Sketch Plan.pdf <br />Riverstone South Sketch Plan.pdf <br />Riverstone South Sketch Plan.pdf <br />Riverstone South Sketch Plan.pdf <br />Riverstone South Sketch Plan.pdf <br />Riverstone South Sketch Plan.pdf <br />Riverstone South Sketch Plan.pdf <br />