Laserfiche WebLink
Riverstone South EAW January 2021 <br />b. Describe effects from project activities on water resources and measures to minimize or mitigate the <br />effects in Item b. i. through Item b. iv. below. <br />i. Wastewater - For each of the following, describe the sources, quantities and composition of all <br />sanitary, municipal/domestic and industrial wastewater produced or treated at the site. <br />1) If the wastewater discharge is to a publicly owned treatment facility, identi any pretreatment <br />measures and the ability of the facility to handle the added water and waste loadings, including <br />any effects on, or required expansion of municipal wastewater infrastructure. <br />The project is expected to produce normal domestic wastewater that is typical of residential <br />developments. The project will not include industrial wastewater production or onsite wastewater <br />treatment. <br />Sanitary wastewater production for the project was estimated using methods described in the Sewer <br />Availability Charge (SAC) Procedure Manual (Metropolitan Council 2017). Metropolitan Council <br />has established 274 gallons per day (GPD) as the average daily wastewater production from a typical <br />residential unit. Based on this residential equivalent, the project is expected to generate an average <br />flow of 66,582 gallons of wastewater per day. Sanitary sewer will be extended from Riverdale Drive <br />to serve the development area. The project will be served by a sanitary sewer lift station that will be <br />installed along Pearson Boulevard in the southeastern part of the site. This lift station will also serve <br />future residential development east of the site and future commercial development north of the site. <br />In addition, the City is looking at scenarios that may use the lift station to serve existing single- <br />family homes located south and west of the project at some point in the future. <br />Domestic wastewater from the project will be routed through the City of Ramsey sanitary sewer <br />system and ultimately to the Metropolitan Wastewater Treatment Plant (MWWTP) located on the <br />Mississippi River near Pig's Eye Lake in St. Paul. With the capacity to treat 251 million gallons of <br />wastewater per day (MGD), this is the largest wastewater treatment facility in Minnesota. The <br />MWWTP is owned and operated by Metropolitan Council. The Metropolitan Council's 2040 Water <br />Resources Policy Plan includes a specific plan to serve the region's projected growth through 2040 <br />and a general plan to serve the region's growth far beyond 2040. The City of Ramsey and <br />Metropolitan Council have planned for increased capacity to convey and treat sanitary wastewater. <br />The proposed project is not expected to require expansion of wastewater treatment infrastructure or <br />raise wastewater treatment capacity concerns. <br />2) If the wastewater discharge is to a subsurface sewage treatment systems (SSTS), describe the <br />system used, the design flow, and suitability of site conditions for such a system. <br />Wastewater will not be discharged to subsurface sewage treatment systems. <br />3) If the wastewater discharge is to surface water, identify the wastewater treatment methods and <br />identify discharge points and proposed effluent limitations to mitigate impacts. Discuss any <br />effects to surface or groundwater from wastewater discharges. <br />Wastewater will be treated in the MWWTP described above and then discharged to the Mississippi <br />River. The MWWTP is an advanced secondary wastewater treatment plant located on the east bank <br />of the Mississippi River, approximately three miles south of downtown St. Paul. Treatment <br />13 <br />