My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/13/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:56:29 PM
Creation date
4/15/2021 11:12:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/13/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF THE ARMY <br />U.S. ARMY CORPS OF ENGINEERS, ST. PAUL DISTRICT <br />180 FIFTH STREET EAST, SUITE 700 <br />ST. PAUL, MN 55101-1678 <br />June 15, 2020 <br />Regulatory File No. 2019-02513-SSC <br />Capstone Homes <br />Steve Bona <br />14015 Sunfish Lake Boulevard, Suite 400 <br />Ramsey, Minnesota 55303 <br />Dear Mr. Bona: <br />We are responding to your request, submitted by Melissa Barrett (Kjolhaug Environmental <br />Services) on your behalf, for Corps of Engineers (Corps) concurrence with the delineation of <br />aquatic resources completed on the Pearson Farm South site. The project site is in Sections 29 <br />and 30, Township 32 North, Range 25 West, Anoka County, Minnesota. <br />We have reviewed the aquatic resource delineation memorandum, dated October 14, 2019 <br />and concur that no aquatic resources are present within review area. Therefore, you are not <br />required to obtain Department of the Army authorization to discharge dredged or fill material <br />within this area. This concurrence is only valid for the review area shown on the enclosed <br />figures labeled MVP-2019-02513-SSC Page 1 of 2 through 2 of 2. <br />This letter does not eliminate the need for state, local, or other authorizations, such as those <br />of the Department of Natural Resources or county. <br />No jurisdictional determination was prepared for this project, nor is one required to support <br />this concurrence. This concurrence may generally be relied upon for five years from the date of <br />this letter. However, we reserve the right to review and revise our concurrence in response to <br />changing site conditions, information that was not considered during our initial review, or off -site <br />activities that could indirectly alter the extent of aquatic resources on -site. Our concurrence <br />may be renewed at the end of this period provided you submit a written request and our staff <br />are able to verify that the determination is still valid. <br />If you have any questions, please contact me in our St. Paul office at (651) 290-5268 or <br />Samantha.S.Coungeris@usace.army.mil. In any correspondence or inquiries, please refer to <br />the Regulatory file number shown above. <br />Sincerely, <br />,4,,.4t,4k CAL <br />Samantha Coungeris <br />Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.