Laserfiche WebLink
Generated with <br />PTV <br />Version 2020 (SP 0-3) <br />VIST O <br />Wiz:) Spack <br />SOLUTIONS <br />Lane Group Calculations <br />Lane Group <br />L <br />C <br />C <br />R <br />C <br />R <br />C, Cycle Length [s] <br />60 <br />60 <br />60 <br />60 <br />60 <br />60 <br />L, Total Lost Time per Cycle [s] <br />5.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />I1_p, Permitted Start -Up Lost Time [s] <br />12, Clearance Lost Time [s] <br />3.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />g_i, Effective Green Time [s] <br />6 <br />31 <br />20 <br />20 <br />15 <br />15 <br />g / C, Green / Cycle <br />0.10 <br />0.53 <br />0.34 <br />0.34 <br />0.25 <br />0.25 <br />(v / s)_i Volume / Saturation Flow Rate <br />0.06 <br />0.13 <br />0.11 <br />0.29 <br />0.04 <br />0.21 <br />s, saturation flow rate [veh/h] <br />1603 <br />3204 <br />3204 <br />1431 <br />1606 <br />2532 <br />c, Capacity [veh/h] <br />154 <br />1692 <br />1088 <br />486 <br />409 <br />644 <br />d1, Uniform Delay [s] <br />26.08 <br />7.64 <br />14.66 <br />18.41 <br />17.38 <br />20.91 <br />k, delay calibration <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />I, Upstream Filtering Factor <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />d2, Incremental Delay [s] <br />4.88 <br />0.07 <br />0.17 <br />4.59 <br />0.20 <br />2.48 <br />d3, Initial Queue Delay [s] <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Rp, platoon ratio <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />PF, progression factor <br />1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />Lane Group Results <br />X, volume / capacity <br />0.67 <br />0.24 <br />0.33 <br />0.86 <br />0.17 <br />0.81 <br />d, Delay for Lane Group [s/veh] <br />30.96 <br />7.72 <br />14.83 <br />23.00 <br />17.58 <br />23.39 <br />Lane Group LOS <br />C <br />A <br />B <br />C <br />B <br />C <br />Critical Lane Group <br />50th-Percentile Queue Length [veh/In] <br />1.51 <br />1.13 <br />1.59 <br />5.25 <br />0.73 <br />3.33 <br />50th-Percentile Queue Length [ft/In] <br />37.87 <br />28.35 <br />39.75 <br />131.18 <br />18.16 <br />83.21 <br />95th-Percentile Queue Length [veh/In] <br />2.73 <br />2.04 <br />2.86 <br />9.00 <br />1.31 <br />5.99 <br />95th-Percentile Queue Length [ft/In] <br />68.17 <br />I 51.04 <br />71.56 <br />I 225.09 <br />32.68 <br />I 149.77 <br />Scenario 12: 12 Mitigated 2040 PM Build <br />