My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/13/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:56:29 PM
Creation date
4/15/2021 11:12:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/13/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
peak hours. Based on ITE's recommendation to use local data when available, the <br />trip generation based on local data was utilized in our analysis. Furthermore, the <br />local data presents a more accurate representation of the proposed land uses as ITE <br />no longer has detached townhome data while the local data does. <br />A trip distribution pattern was developed for the generated traffic going to and from <br />the proposed development. This pattern is based on the existing traffic volumes, site <br />access, and access to the regional transportation system. The general trip <br />distribution pattern for this study is: <br />i. 44% of the generated traffic to/from the west on Highway 10. <br />ii. 11% of the generated traffic to/from the north on Armstrong Boulevard. <br />i i i. 44% of the generated traffic to/from the east on Highway 10. <br />iv. 1% percent of the generated traffic to/from the south on Riverdale Drive. <br />Traffic generated by the site development was assigned to the area roadways per <br />this distribution pattern. <br />b. Non -site Traffic Forecasting <br />The impacts of the proposed development are studied in 2022 and 2040. To forecast <br />future traffic volumes in the study area outside of the proposed development's <br />traffic, specific other developments around the site and the general growth in traffic <br />are considered. <br />Several sources were considered to determine general background growth in the <br />area, including: <br />• Historic traffic data on the study roadways. <br />• 2040 forecast volumes from the 2040 Comprehensive Plan. <br />• Generic growth factor for the County as developed by MnDOT's County Growth <br />Projection Factors. <br />• Previous traffic studies in the surrounding area. <br />Based on this information, a growth rate of approximately 2.0% per year was <br />calculated. This growth rate was applied to all movements in the study network <br />except for those accessing the development, since those movements will only be <br />increased with the development's forecast trip generation. <br />Applying this background growth rate to the existing traffic volumes established the <br />2022 and 2040 No -Build forecasts. <br />c. Total Traffic <br />Traffic forecasts were developed for the 2022 and 2040 scenarios by adding the traffic <br />generated by the proposed development to the non -site forecast volumes. The <br />resultant 2022 and 2040 peak hour forecasts are shown in Figures 2 through 4 in the <br />Appendix. <br />Traffic Impact Study 6 <br />Riverstone South Development <br />'#= Spak <br />
The URL can be used to link to this page
Your browser does not support the video tag.