My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/13/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:56:29 PM
Creation date
4/15/2021 11:12:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/13/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This configuration removes the highest delayed movement, the cross street left - <br />turning movement (northbound left) from the intersection. These vehicles will now <br />need to route east along Riverdale Drive to the northern Highway 10 Ramps on <br />Armstorng Boulevard, where they will then be able to proceed westbound on <br />Highway 10. In total, roughly 2.25 miles will be added to these vehicles drive, however <br />with projected delays of 21 mintues to more than one hour by the 2040 build <br />scenario, this rerouting will take less time than if the vehicles were to wait to <br />complete a northbound left at the Hwy 10/ Riverdale Drive intersection. <br />The restricted access mitigation was run for the 2040 scenario to determine if it was <br />an effective solution for the delay concerns. The results were improved to: <br />• 46 seconds of delay per vehicle for northbound vehicles with queueing of less <br />than two vehicles in the 2040 a.m. build scenario. <br />• 26 seconds of delay per vehicle for northbound vehicles with queueing of less <br />than one vehicle in the 2040 p.m. build scenario. <br />As previously mentioned, and based on our experience, improvements are not <br />warranted at side -street stop -controlled intersections until the 95th percentile queue <br />at a stop sign is in the five to ten vehicle range. This proposed mitigation reduces <br />the queue to less than five vehicles and brings delays back to standard levels for <br />side street movements at side -street stop -controlled intersections intersecting with <br />busy roadways. The full capacity analysis results can be seen in the Appendix. <br />d. Concept Site Plan & Multi -Modal Review <br />The concept site plan contained in the Appendix was reviewed to determine if the <br />plan meets city requirement's, provides appropriate circulation, and minimizes <br />conflicts. Following are key transportation elements of the concept site plan: <br />i. Car Circulation: vehicle circulation is provided in the site with two proposed <br />accesses on Riverdale Drive. These accesses both provide connections to the <br />entire site, meaning if one access becomes blocked due to a crash or vehicle <br />breakdown, drivers will still be able to navigate the site and enter/exit using <br />the alternate access. Additional future connection stub -outs are provided on <br />the east and west of the site providing further connections when/if the area <br />is built out further. <br />ii. Truck Circulation: Heavy vehicle turning movements should be considered <br />within the site. Specifically, the two internal cul-de-sacs should be designed <br />in a way that garbage trucks can easily turn around without require any <br />reversing movements. <br />iii. Bicycle/Walking Paths: No bicycle paths are currently shown on the site plan. <br />At a minimum, a ten -foot wide trail connection on the south side of Riverdale <br />Drive, from the future Highway 10/Riverdale Drive intersection trail system to <br />the trail system that starts on the east side of Riverdale Drive/Llama Street, <br />should be provided. This connection will provide both walking and bicycle <br />Traffic Impact Study 13 <br />Riverstone South Development <br />'#= Spak <br />
The URL can be used to link to this page
Your browser does not support the video tag.