Laserfiche WebLink
Appendix F - Capacity Analysis Backup <br />Generated with <br />PTV <br />Version 2020 (SP 0-3) <br />VISTRO <br />Wiz:) Spack <br />SOLUTIONS <br />Lane Group Calculations <br />Lane Group <br />L <br />C <br />C <br />R <br />C <br />R <br />C, Cycle Length [s] <br />42 <br />42 <br />42 <br />42 <br />42 <br />42 <br />L, Total Lost Time per Cycle [s] <br />5.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />I1_p, Permitted Start -Up Lost Time [s] <br />12, Clearance Lost Time [s] <br />3.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />g_i, Effective Green Time [s] <br />3 <br />19 <br />11 <br />11 <br />10 <br />10 <br />g / C, Green / Cycle <br />0.06 <br />0.45 <br />0.26 <br />0.26 <br />0.24 <br />0.24 <br />(v / s)_i Volume / Saturation Flow Rate <br />0.02 <br />0.08 <br />0.07 <br />0.20 <br />0.01 <br />0.14 <br />s, saturation flow rate [veh/h] <br />1603 <br />3204 <br />3204 <br />1431 <br />1610 <br />2532 <br />c, Capacity [veh/h] <br />99 <br />1452 <br />832 <br />371 <br />380 <br />598 <br />d1, Uniform Delay [s] <br />18.87 <br />6.84 <br />12.35 <br />14.28 <br />12.38 <br />14.15 <br />k, delay calibration <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />I, Upstream Filtering Factor <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />d2, Incremental Delay [s] <br />2.50 <br />0.06 <br />0.18 <br />3.16 <br />0.07 <br />0.90 <br />d3, Initial Queue Delay [s] <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Rp, platoon ratio <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />PF, progression factor <br />1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />Lane Group Results <br />X, volume / capacity <br />0.39 <br />0.19 <br />0.28 <br />0.76 <br />0.06 <br />0.58 <br />d, Delay for Lane Group [s/veh] <br />21.37 <br />6.90 <br />12.53 <br />17.44 <br />12.45 <br />15.06 <br />Lane Group LOS <br />C <br />A <br />B <br />B <br />B <br />B <br />Critical Lane Group <br />50th-Percentile Queue Length [veh/In] <br />0.38 <br />0.49 <br />0.70 <br />2.25 <br />0.15 <br />1.28 <br />50th-Percentile Queue Length [ft/In] <br />9.50 <br />12.32 <br />17.43 <br />56.13 <br />3.66 <br />32.11 <br />95th-Percentile Queue Length [veh/In] <br />0.68 <br />0.89 <br />1.25 <br />4.04 <br />0.26 <br />2.31 <br />95th-Percentile Queue Length [ft/In] <br />17.10 <br />I 22.17 <br />31.37 <br />I 101.04 <br />6.59 <br />I 57.79 <br />Scenario 2: 2 PM Exist <br />F29 <br />