Laserfiche WebLink
Appendix F - Capacity Analysis Backup <br />Generated with <br />PTV <br />Version 2020 (SP 0-3) <br />VISTRO <br />Wiz:) Spack <br />SOLUTIONS <br />Lane Group Calculations <br />Lane Group <br />L <br />C <br />C <br />C <br />R <br />C <br />R <br />C, Cycle Length [s] <br />40 <br />40 <br />40 <br />40 <br />40 <br />40 <br />40 <br />L, Total Lost Time per Cycle [s] <br />5.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />I1_p, Permitted Start -Up Lost Time [s] <br />2.00 <br />12, Clearance Lost Time [s] <br />3.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />g_i, Effective Green Time [s] <br />1 <br />17 <br />11 <br />11 <br />11 <br />9 <br />9 <br />g / C, Green / Cycle <br />0.03 <br />0.44 <br />0.27 <br />0.27 <br />0.27 <br />0.24 <br />0.24 <br />(v / s)_i Volume / Saturation Flow Rate <br />0.01 <br />0.11 <br />0.12 <br />0.12 <br />0.11 <br />0.02 <br />0.08 <br />s, saturation flow rate [veh/h] <br />1603 <br />3204 <br />1645 <br />1532 <br />1431 <br />1609 <br />2532 <br />c, Capacity [veh/h] <br />51 <br />1404 <br />524 <br />412 <br />385 <br />382 <br />602 <br />d1, Uniform Delay [s] <br />18.99 <br />7.11 <br />12.13 <br />12.16 <br />11.99 <br />11.91 <br />12.73 <br />k, delay calibration <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />I, Upstream Filtering Factor <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />d2, Incremental Delay [s] <br />3.51 <br />0.09 <br />0.45 <br />0.76 <br />0.67 <br />0.10 <br />0.36 <br />d3, Initial Queue Delay [s] <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Rp, platoon ratio <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />PF, progression factor <br />1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />Lane Group Results <br />X, volume / capacity <br />0.32 <br />0.25 <br />0.38 <br />0.45 <br />0.40 <br />0.09 <br />0.36 <br />d, Delay for Lane Group [s/veh] <br />22.50 <br />7.20 <br />12.58 <br />12.92 <br />12.66 <br />12.01 <br />13.09 <br />Lane Group LOS <br />C <br />A <br />B <br />B <br />B <br />B <br />B <br />Critical Lane Group <br />50th-Percentile Queue Length [veh/In] <br />0.17 <br />0.64 <br />1.18 <br />1.13 <br />0.93 <br />0.21 <br />0.68 <br />50th-Percentile Queue Length [ft/In] <br />4.32 <br />15.90 <br />29.61 <br />28.26 <br />23.32 <br />5.26 <br />17.12 <br />95th-Percentile Queue Length [veh/In] <br />0.31 <br />1.15 <br />2.13 <br />2.03 <br />1.68 <br />0.38 <br />1.23 <br />95th-Percentile Queue Length [ft/In] <br />7.78 <br />I 28.63 <br />53.30 <br />I 50.87 141.97 <br />9.46 <br />I 30.82 <br />Scenario 5: 5 2040 AM No -Build <br />F79 <br />