Laserfiche WebLink
Appendix F - Capacity Analysis Backup <br />Generated with <br />PTV <br />Version 2020 (SP 0-3) <br />VASTO <br />Wiz:) Spack <br />SOLUTIONS <br />Volumes <br />Name <br />Base Volume Input [veh/h] <br />2 <br />34 <br />248 <br />210 <br />257 <br />19 <br />2 <br />320 <br />Base Volume Adjustment Factor <br />1.000 <br />1.000 <br />1.000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Heavy Vehicles Percentage [%] <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />Growth Factor <br />1.490 <br />1.490 <br />1.490 <br />1.4900 <br />1.4900 <br />1.4900 <br />1.4900 <br />1.4900 <br />In -Process Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Site -Generated Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Diverted Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Pass -by Trips [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Existing Site Adjustment Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Other Volume [veh/h] <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Right Turn on Red Volume [veh/h] <br />0 <br />0 <br />Total Hourly Volume [veh/h] <br />3 <br />51 <br />370 <br />313 <br />383 <br />28 <br />3 <br />477 <br />Peak Hour Factor <br />0.916 <br />0.916 <br />0.916 <br />0.9160 <br />0.9160 <br />0.9160 <br />0.9160 <br />0.9160 <br />Other Adjustment Factor <br />1.000 <br />1.000 <br />1.000 <br />1.01— <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />1.0000 <br />Total 15-Minute Volume [veh/h] <br />1 <br />14 <br />101 <br />n <br />n <br />85 <br />105 <br />8 <br />1 <br />130 <br />Total Analysis Volume [veh/h] <br />3 <br />56 <br />404 <br />342 <br />418 <br />31 <br />3 <br />521 <br />Presence of On -Street Parking <br />No <br />No <br />No <br />No <br />No <br />No <br />On -Street Parking Maneuver Rate [/h] <br />0 <br />0 <br />0 <br />Local Bus Stopping Rate [/h] <br />lj <br />I ° <br />I U <br />0 <br />0 <br />I 0 <br />I 0 <br />I <br />I <br />I <br />I 0 <br />v_do, Outbound Pedestrian Volume crossing <br />0 <br />0 <br />v_di, Inbound Pedestrian Volume crossing <br />m 0 <br />0 <br />v_co, Outbound Pedestrian Volume crossing <br />0 <br />n <br />0 <br />v_ci, Inbound Pedestrian Volume crossing mi <br />0 <br />u <br />0 <br />v_ab, Corner Pedestrian Volume [ped/h] <br />0 <br />0 <br />0 <br />0 <br />Bicycle Volume [bicycles/h] <br />0 <br />0 <br />0 <br />Scenario 6: 6 2040 PM No -Build <br />F94 <br />