Laserfiche WebLink
Appendix F - Capacity Analysis Backup <br />Generated with <br />PTV <br />Version 2020 (SP 0-3) <br />VISTRO <br />Wiz:) Spack <br />SOLUTIONS <br />Lane Group Calculations <br />Lane Group <br />L <br />C <br />C <br />R <br />C <br />R <br />C, Cycle Length [s] <br />58 <br />58 <br />58 <br />58 <br />58 <br />58 <br />L, Total Lost Time per Cycle [s] <br />5.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />6.50 <br />I1_p, Permitted Start -Up Lost Time [s] <br />12, Clearance Lost Time [s] <br />3.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />4.50 <br />g_i, Effective Green Time [s] <br />5 <br />30 <br />20 <br />20 <br />15 <br />15 <br />g / C, Green / Cycle <br />0.09 <br />0.52 <br />0.34 <br />0.34 <br />0.26 <br />0.26 <br />(v / s)_i Volume / Saturation Flow Rate <br />0.05 <br />0.13 <br />0.11 <br />0.29 <br />0.04 <br />0.21 <br />s, saturation flow rate [veh/h] <br />1603 <br />3204 <br />3204 <br />1431 <br />1606 <br />2532 <br />c, Capacity [veh/h] <br />137 <br />1670 <br />1093 <br />488 <br />411 <br />648 <br />d1, Uniform Delay [s] <br />25.58 <br />7.67 <br />14.23 <br />17.87 <br />16.88 <br />20.31 <br />k, delay calibration <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />0.11 <br />I, Upstream Filtering Factor <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />d2, Incremental Delay [s] <br />3.47 <br />0.08 <br />0.17 <br />4.45 <br />0.20 <br />2.40 <br />d3, Initial Queue Delay [s] <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Rp, platoon ratio <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />PF, progression factor <br />1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />1.00 <br />I 1.00 <br />Lane Group Results <br />X, volume / capacity <br />0.55 <br />0.25 <br />0.32 <br />0.86 <br />0.17 <br />0.80 <br />d, Delay for Lane Group [s/veh] <br />29.05 <br />7.75 <br />14.40 <br />22.33 <br />17.08 <br />22.71 <br />Lane Group LOS <br />C <br />A <br />B <br />C <br />B <br />C <br />Critical Lane Group <br />50th-Percentile Queue Length [veh/In] <br />1.06 <br />1.11 <br />1.53 <br />5.05 <br />0.70 <br />3.21 <br />50th-Percentile Queue Length [ft/In] <br />26.55 <br />27.87 <br />38.26 <br />126.36 <br />17.53 <br />80.32 <br />95th-Percentile Queue Length [veh/In] <br />1.91 <br />2.01 <br />2.75 <br />8.74 <br />1.26 <br />5.78 <br />95th-Percentile Queue Length [ft/In] <br />47.79 <br />I 50.16 <br />68.86 <br />I 218.54 <br />31.56 <br />I 144.57 <br />Scenario 10: 10 2040 PM Build <br />F182 <br />