My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/12/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 07/12/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:52:17 PM
Creation date
7/11/2005 7:18:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE/~ <br /> <br />UPDATE ON TH 47 TRAIL INSTALLATION <br /> By: Steven J. Jankowski? City_Engineer <br /> <br />Background: <br /> <br />The completion of a pedestrian trail along the west side of TH 47 has been identified as a <br />high priority project to complete the link between Alpine drive and Elmcrest Park. <br />Attached is a figure illustrating the segments of the trail which remain to be installed. <br />Several issues have affected the progress of this trail construction. <br /> <br />· The final land parcel (Mortenson) neCessary to complete this link now appears <br /> will be available in early July. <br />· It .is anticipated that the extension of sewer andWater to MarigOld Ponds will <br /> cause construction to occur along the west side of TH 47 from Apple Ridgeto <br /> Elmcrest Park. <br />· A bridge over County Ditch 3/66 is reqUired. <br />· A street paving project is pending for the St Francis Blvd frontage road south of <br /> 160th Lane. '. <br /> <br />The purpose of this case is to focus on a proposed schedule for the goal of getting this <br />trail segment completed. Staffproposes the following schedule: <br /> <br />Week of June 20th - field work be completed to determine the length and <br />specifications for the bridge. <br />Week of July 4th - Order quotations for bridge. <br />July - Complete field work to determine trail alignment and' apply for permits if <br />necessary, <br />August - Construct trail improvements in conjunction with the work being <br />Preformed with the improvements undert .,a2ken for. Marigold Ponds. <br /> <br />Recommendation: <br /> <br />Based upon discussion <br /> <br />Action: <br /> <br />None required at this time <br /> <br />Reviewed By: .. <br />Public Works. Diredtor/Fire Chief <br />Assistant Public Works Direction/Principal Engineer <br />Parks Supervisor <br /> <br />PW: 06/21/05 -. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.