My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 04/13/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 04/13/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:56:51 PM
Creation date
4/15/2021 4:27:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
04/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FPS <br />EIecricI Production Srvices <br />DOOR ACCESS SYSTEM INSTALLATION <br />• EPS to provide, install, test and program the following new PDK Door Access System within <br />the below listed City of Ramsey facilities. EPS to utilize all existing card readers and door <br />locks if possible, all door hardware to be existing and utilized for this installation. <br />• EPS will provide and install new PDK head end and ICLOUD network node within each facility <br />broken out below within the proper IT Closet locations. <br />• EPS to provide the proper control cable to each door location if required, EPS will utilize all <br />existing door hardware, strikes, and card reader cabling were applicable. This was <br />determined from a walk through at each site location on 11/23/2020. <br />• Excludes additional door hardware if required for proper operation on current door <br />locations, EPS will provide all new strikes and card readers were required any additional <br />door hardware from this will be provided and installed by others. <br />• Power supplies are included within proposal pricing listed below, but the electrical <br />termination for these power supplies to be done by others on sperate contract. <br />• Door Access System will function over an IP hosted based platform and can be accessed via <br />web browser. <br />• EPS to provide three-year hosted licenses for all doors listed below for City of Ramsey. <br />Upgrade for doors on licenses will need to be renewed after the three-year period. Pricing <br />for this with each pricing breakout and at the bottom of this proposal if all options are <br />accepted. <br />• EPS to utilize current pathways if raceways are required EPS will provide these within this <br />proposal pricing. If lift for installation is required, this to be supplied by the City of Ramsey. <br />• EPS to utilize City of Ramsey existing cards and fobs for programming of system. <br />• EPS to provide full programming and training of PDK Door Access System after project end. <br />• TAX NOT INCLUDED within each of the pricing breakouts listed below. <br />Pricing breakout and scope listed below for all facilities: <br />Abbreviations: (ES (Electric Strike), CR (Card Reader), DPS (Door Position Switch) <br />
The URL can be used to link to this page
Your browser does not support the video tag.