My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/20/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 04/20/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:32:50 AM
Creation date
4/20/2021 9:19:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />March 4, 2021 <br />Tim Gladhill, AICP <br />Deputy City Administrator <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Engineering Services —Trott Brook North (MUSA Area) — Public Utilities <br />Dear Mr. Westby: <br />We appreciate the opportunity to assist the City of Ramsey with the analysis of servicing the area north <br />of Trott Brook, within the MUSA boundary, with public utilities. <br />There are several potential development scenarios that could be brought forward for the area north of <br />Trott Brook, west of Nowthen Boulevard. The specific properties being evaluated for this study include: <br />• Hunt Addition: A 35.5 acre parcel between 173rd Avenue and 175th Avenue, west of Nowthen <br />Boulevard. <br />• Makowsky Addition: An approximate 200 acre parcel directly north of Trott Brook between <br />Nowthen Boulevard and Variolite Street. <br />Three development scenarios will be reviewed: <br />• The Hunt Addition develops as a stand-alone project, <br />• The Hunt Addition and a portion of the Makowsky Addition develop simultaneously, and <br />• The Hunt Addition and all of the Makowsky Addition develop simultaneously. <br />For each of the scenarios, we will review required improvements and costs associated with those <br />improvements. The costs will be separated between development responsibility and trunk utility <br />responsibility. We will review needs and costs associated with roadway, storm sewer, water main, <br />sanitary sewer improvements. <br />Base Analysis <br />Our base analysis will include the following: <br />Water Main — We will review the City's Comprehensive plan and determine the improvements required <br />to serve the area(s). <br />Roadways — The roadway network will be reviewed to determine the improvements required. <br />Temporary improvements will be identified if they are needed to serve the development(s). <br />Sanitary Sewer — We will review options for each of the three development scenarios, including <br />temporary service if the Hunt Addition develops individually. For the sanitary sewer analysis, we will <br />C:\Users\kevinki\Desktop\Trott Brook Sanitary Sewer \Ramsey Trott Brook Analysis 03022021.docx <br />Bolton & Menk 15 an equal. opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.