Tim Gladhill, AICP <br />March 4, 2021 <br />Page 3 of 4 <br />Estimates and Memorandum <br />Estimates and Memorandum: We will prepare a brief Memorandum with exhibits depicting the results <br />of the study. High level construction cost estimates will also be prepared for use in budgeting for the <br />improvements. Fees associated with this task are estimated at $3,240. <br />Additional Recommendations <br />Based on the findings of our analysis, we may make recommendations for tasks which should be <br />completed during the design phase of future projects. The recommendations could include such items <br />as: soil borings, additional survey, additional lift station related testing (concrete, power supply, etc.), <br />and 1/1 analysis of the existing sanitary sewer system in the area. <br />Optional: Lift Station Analysis <br />Our proposed analysis will assume that the existing lift station will be able to accommodate flows from <br />the Hunt Addition on a temporary basis. Once the Makowsky Addition develops, the Hunt Addition <br />sanitary sewer flows will be conveyed through the Makowsky Addition. <br />The current Sanitary Sewer Comprehensive Plan depicts service to this area via gravity sewer which then <br />flows to an existing lift station. The lift station then pumps the sewage through a forcemain which <br />discharges in Variolite Street near 166th Avenue. Our understanding is that the lift station is at or near <br />capacity, requiring alternative solutions to be explored. <br />The lift station analysis will most likely include the following components: <br />• Meet with Public Works staff to gain an understanding of existing operations of the facility, <br />• Complete a site visit and perform a cursory review and condition assessment, <br />• Review the control panel, SCADA system and power source. Develop recommendations based <br />on reliability and long-term usage of the existing equipment. <br />• Analyze existing and future flows to the facility. Develop an estimate of when pump <br />replacement will need to occur. <br />• Analyze forcemain, lift station structure and pump capacity to determine if capacity exists when <br />full development of the service area occurs. <br />• Perform a general assessment of the existing power source. Provide discussion related to the <br />implications of power failure, the potential need for a backup power generator, and <br />consequences of power failure. <br />• Prepare cost estimates for recommended improvements. <br />The above analysis is estimated to cost $9,260. The actual fees may vary, depending upon the findings <br />described in the primary task. <br />E3crltrrrr & M r k. 15 an <br />fy <br />unity <br />i pLoyer. <br />