My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/27/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:57:46 PM
Creation date
5/11/2021 10:31:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7550 Sunwood Drive NW • Ramsey, MN 55303 <br />City Hall: 763.427.1410 • Fax: 763.427.5543 <br />www.cityoframsey.com <br />MEMORANDUM <br />Date: April 6, 2021 <br />From: City of Ramsey Building Division <br />Re: 6745 Highway 10 <br />An internal request was made for the Building Division to conduct an on -site inspection of the <br />building at 6745 Hwy. 10 to evaluate it for potential occupancy. The following list of items <br />represents the minimum steps required for the type of use described at the time of the <br />inspection. Completion of the work could allow for the minimum requirements needed to <br />occupy the building. <br />Office Area: <br />• Properly terminate all open electrical wiring. <br />• Service bathroom fixtures to ensure they are functioning properly. <br />Two Bay Vehicle Service Area with Below Grade "Pits": <br />• Disconnect and eliminate all pit electrical wiring. Work to include confirming the <br />electrical panel located in the two bay area does not service the three bay area. <br />• Disconnect and eliminate all non -gravity plumbing in the pit area. Work to include <br />removal of fixtures and capping water lines as needed. <br />• Install a barrier to prevent access to the stairway leading to the pit area. <br />• Install structural covers over pit openings — designed to withstand the anticipated loads. <br />• Pump existing waste out of sump basket and dispose of properly. Work to include <br />providing an electrical outlet at the grade level for the sump pump and a means to <br />service to the pump if needed. <br />• Provide a structural evaluation of the steel beam located in the pit area supporting the <br />concrete planks and the cracked plank perpendicular to the beam by a Licensed Design <br />Professional. <br />It is our mission to work together to responsibly grow our community, <br />and to provide quality, cost-effective, and efficient government services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.