My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/27/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:57:46 PM
Creation date
5/11/2021 10:31:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />March 22, 2021 <br />Bruce Westby, P.E. <br />City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services, City of Ramsey — Business Park 95 Street <br />Reconstruction (City Project No. 21-03) <br />Dear Mr. Westby: <br />We appreciate the opportunity to assist the City of Ramsey with construction staking for the Business <br />Park 95 Street Reconstruction (City Project No. 21-03). <br />The improvement is generally a reclamation project, with spot curb replacement. Staking is anticipated <br />to include: <br />• Several segments of storm sewer pipe, <br />• A portion of the concrete curb and gutter replacement, <br />• Alternate: The McKinley Street alternate is anticipated to require survey staking for the grading, <br />concrete curb and gutter, class 5 aggregate base course, storm sewer culvert, and catch basin. <br />Bolton & Menk will also complete Record Drawing related surveying for the project. <br />We have made the following assumptions related to the base project in preparing this proposal: <br />• 5.5 hours of office surveyor time will be required to prepare the files, and <br />• 18 hours of field survey time will be required. <br />For the McKinley Street alternate, we assumed: <br />• 2.5 hours of office surveyor time will be required to prepare the files, and <br />• 14 hours of field survey time will be required. <br />All work associated with the base project will be completed for a Not -to -Exceed amount of $3,250. If the <br />McKinley Street alternate is also completed, the total Not -to -Exceed amount will be $6,240. If there are <br />any questions, please call me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />C:\Users\kevinki\Desktop\Ramsey 2021 Staking\Ramsey Staking Survey - Business Park 95 03222021.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.