Alternative #1 — Motion to adopt Resolution #21-108 accepting bids and awarding a contract for 2021 MSA <br />Pavement Overlay Improvements, Improvement Project #21-05, to North Valley, Inc. for the total bid in the amount <br />of $206,395.58. <br />Alternative #2 — Motion to deny adoption of Resolution #21-108 at this time. <br />Funding Source: <br />Bids were advertised in the Anoka Union Herald and in Finance and Commerce on March 26 and April 2, 2021. On <br />April 19, 2021 a total of eight (8) bids were received, opened, and tabulated, and the following bids were found to <br />comply with the advertisement for bids. <br />CONTRACTOR TOTAL BID <br />North Valley, Inc. i $ 206,3 95.5 8 <br />Valley Paving, Inc. <br />Northwest <br />$ 220,979.51 <br />$ 226,862.01 <br />Park Construction Company $ 229,115.44 <br />Asphalt Surface Technologies Corp. $ 232,644.68 <br />Rum River Contracting $ 23 8,757.01 <br />Bituminous Roadways, Inc. $ 245,713.77 <br />Omann Brothers Paving, Inc. <br />Engineer's Estimate <br />$ 256,877.47 <br />$258,919.50 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $206,395.58 for the total bid for <br />construction of said improvements in accordance with the approved plans and specifications and advertisement for <br />bids, is the lowest responsible bid. Adding indirect costs in the amount of 14% brings total project costs to <br />$235,290.96. <br />The low bid is 20% less than the engineer's estimate of $258,919.50, primarily due to lower than estimated <br />bituminous paving costs. <br />Funding sources for these improvements includes a mix of Municipal State Aid (MSA) Funds, and Stormwater <br />Utility Funds. <br />• MSA Funds = $229,380.69 <br />• Stormwater Utility Funds = $5,910.27 <br />• Total Project Costs = $235,290.96 <br />City Staff proposes to administer and inspect construction. <br />Plans and specifications were prepared in-house as part of Staffs normal duties. <br />Recommendation: <br />Staff recommends Alternative #1. <br />Action: <br />Motion to adopt Resolution #21-108 accepting bids and awarding a construction contract for 2021 MSA Pavement <br />Overlay Improvements, Improvement Project #21-05, to North Valley, Inc. for the total bid in the amount of <br />$206,395.58. <br />Attachments <br />Resolution #21-108 <br />21-05 Final Plans <br />