My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/27/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:57:46 PM
Creation date
5/11/2021 10:31:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work and Staging Areas: <br />Confine work activities to the Pump House site. Contactor is responsible for <br />protecting driveway pavement from breaking and damage. No mechanized <br />equipment shall be left overnight on the site (unless fenced), and no construction <br />activity shall be performed before 7 AM nor after 7 PM Monday through Saturday. <br />The contractor shall provide 72-hour advance notice before working on Saturday. <br />City Council approval is required for Sunday work. <br />Coordinate staging area and fencing with the City's representative prior to beginning <br />the Work. Pump House operations may not be interrupted by the Work and access <br />to the building must be maintained continuously. <br />Liquidated Damages: <br />Liquidated damages shall be deducted from the approved quoted amount, in a sum of <br />$30 dollars per weekday (M-F) for non -completion after August 31st, 2021, or 120 <br />calendar days after City's issuance of notice to proceed —whichever occurs later. <br />Warranty/Guarantee: <br />The Contractor warrants and guarantees to the Owner that all installation Work will <br />be of good quality and free from faults or defects in accordance with this RFQ. All <br />defective Work may be rejected. <br />If required by the Owner, prior to payment, the Contractor will promptly without cost <br />to the Owner, correct defective Work, or replace it with non -defective Work. If the <br />Contractor does not correct such defective Work or remove and replace within a <br />reasonable time, the Owner may have the deficiency corrected or the rejected Work <br />removed and replaced. All direct or indirect costs of such correction or removal and <br />replacement, including compensation for additional professional services shall be <br />paid by the Contractor, or deducted by the Owner, all such costs from the quoted <br />contract price. <br />If, instead of requiring correction or removal and replacement of defective Work, the <br />Owner (prior to approval of final payment) prefers to accept it, they may do so. In <br />such case, if the acceptance occurs prior to final payment, a Statement shall be issued <br />incorporating the necessary revisions, including appropriate reductions in Contract <br />Price. <br />4 1age <br />
The URL can be used to link to this page
Your browser does not support the video tag.