My WebLink
|
Help
|
About
|
Sign Out
Home
#21-108
Ramsey
>
Resolutions
>
2020's
>
2021 - All Res Executed
>
#21-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 2:16:00 PM
Creation date
5/11/2021 2:15:59 PM
Metadata
Fields
Template:
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Councilmember Heineman introduced the following resolution and moved for its adoption: <br /> <br />RESOLUTION #21-108 <br /> <br />RESOLUTION 2021 MSA <br />ACCEPTING BIDS AND AWARDING CONTRACT FOR <br />PAVEMENT OVERLAY IMPROVEMENTS, IMPROVEMENT PROJECT #21-05 <br /> <br />WHEREAS, <br />the City of Ramsey proposes to overlay the pavement on numerous <br />Municipal State Aid (MSA) street segments in 2021 as identified within the 2021 – 2030 Capital <br />Improvement Program; and <br /> <br />WHEREAS <br />, funding for this improvement is proposed to come from the MSA Fund and <br />Stormwater Utility Fund with a total estimated project cost of $295,000; and <br /> <br />WHEREAS, <br /> pursuant to Ramsey City Staff resolution #21-012, adopted January 12, <br />2021, the City Engineer has prepared plans and specifications for the purpose of advertising for <br />bids for the same improvements. <br /> <br />WHEREAS <br />, pursuant to Ramsey City Council resolution #21-075, adopted March 23, <br />2021, the City Council approved final plans and specifications as prepared by the City Engineer <br />and authorized advertisement for bids for said improvements; and <br /> <br />WHEREAS <br /> , eight (8) bids were received, opened, and tabulated on April 19, 2021, and <br />the following bids were found to comply with the approved plans and specifications and <br />advertisements for bids; and <br /> <br />CONTRACTOR TOTAL BID <br />North Valley, Inc. $ 206,395.58 <br />Valley Paving, Inc. $ 220,979.51 <br />Northwest $ 226,862.01 <br />Park Construction Company $ 229,115.44 <br />Asphalt Surface Technologies Corp. $ 232,644.68 <br />Rum River Contracting $ 238,757.01 <br />Bituminous Roadways, Inc. $ 245,713.77 <br />Omann Brothers Paving, Inc. $ 256,877.47 <br /> <br />WHEREAS <br /> , the bid of North Valley, Inc., of Nowthen, Minnesota, in the amount of <br />$206,395.58 for the total bid for construction of the improvements in accordance with the approved <br />plans and specifications and advertisement for bids, is the lowest responsible bidder and their bid <br />shall be and hereby is accepted. <br /> <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.