Laserfiche WebLink
dduudde <br />INSTRUCTVIONV <br />d;, <br />1@IlO1Vp! <br />IIlllll I <br />11 IIIIIIIIIIIIIIII IIIIIIIIIIIIII ��i Illli uIIIIIIIIIIIII Vlllllllllllllllllll"""""" <br />II ,III IIIIII IIIIIIIIIIIII <br />IIII <br />4)4druuuumuuu1dlmmi0 <br />FolIIoWna us on 'Tunelifler olrjruicolrn st ruction <br />City a 11f OIL' a Iona s':w.y ,,,,„ III' uu.ull <br />II' Ilro,g IIP° <br />b <br />liico No Ilr° k, s <br />oo UIII dat:w, <br />II\ Ill ay 20 , 2021 <br />The floor slab in warm storage is now 75% complete. There <br />is 1 more pour left and then the floor will be complete in <br />warm storage. <br />Interior framing in the office area is ongoing. <br />Metal panel install is nearing completion. <br />discover the projects <br />##RJMBuilds <br />