My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 06/10/2021
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2021
>
Agenda - Economic Development Authority - 06/10/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:36:07 PM
Creation date
6/7/2021 12:59:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
06/10/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Economic Development Authority (EDA) <br />Meeting Date: 06/10/2021 <br />Submitted For: Sean Sullivan, Community Development <br />By: Sean Sullivan, Community Development <br />4. 1. <br />Title: <br />Consider Renovation and Lease of Old Town Hall <br />Purpose/Background: <br />The purpose of this case is two fold. <br />1. Structural Renovation of structure. <br />2. Leasing of space to private business. <br />The City has been approached by a private business, Small Town Boutique, interested in leasing this building. In <br />order to lease the space, several repairs to the building need to be completed. The building is listed on the National <br />Historic Registry, so any repairs need to be consistent with this protection. The estimated cost of repairs is between <br />$40,000 and $50,000 (planning -level estimates only, not based on actual contractor quotes). <br />Notification: <br />N/A <br />Observations/Alternatives: <br />Renovation <br />The City worked with the U of M and Resilient Communities Project (RCP) to put together a 1) Historical Report <br />of the Old Town Hall (17A) and 2) the Future of Ramsey Town Hall (17B). The Historical Report has been <br />provided for reference but the focus of the discussion centers around the renovation and future use of this historical <br />building in Report 17B. The report evaluated the pros and cons of keeping the building at is current location or <br />moving it to the COR. The report concluded that leaving it ats current location would allow it to remain on the <br />National Register and not risk damaging the building by moving it. The report than looked at what would be needed <br />to renovate the building so it could be restored appropriately and be able to be occupied and used. Any renovation <br />would need to comply with the Secretary of the Interior's Standards for Rehabilitation as outlined in the RCP report <br />In order to maintain its place on the National Register, special care must be taken to restore the building as close to <br />the original conditions as possible. The report outlines the 2 major steps necessary to get to this point: 1) <br />Climatization and 2) Pre -Occupancy Upgrade. In 2018, the cost to bring this building into operation was estimated <br />to be $44,940. in 2019, the City re -roofed the building and repaired the eaves. There is still some minor work to do <br />in this area but the cost should be minimal (under $1,000). Staff has put together a document outlining the estimated <br />costs to renovate and lease the Old Town Hall. Staff is supportive of completing the renovation of this historic <br />building. <br />Future Use <br />The 17b RCP report discussed potential future use of the Old Town Hall. Uses contemplated ranged from a public <br />space, museum, school, arts, business and incubator. Staff has received multiple requests about the availability of <br />the building for lease for various types of businesses. Schools and retail uses have approached the City but due to <br />the condition and renovation needed to the building the users go elsewhere. These users are excited at the possibility <br />of using this unique building and think its allure will benefit their businesses. The current interested party has been <br />very patient with the city and the use of a boutique with limited hours seems like a great fit for this building. <br />Parking is also difficult to solve for and any agreement with a future tenant would likely need some sort of cross <br />parking easement with the adjacent properties. <br />
The URL can be used to link to this page
Your browser does not support the video tag.