My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/15/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 06/15/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:33:29 AM
Creation date
6/11/2021 3:31:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed for 2023, pending City & County approvals <br />• City Council presentation anticipated June 22 <br />• CSAH 116 Interim Improvements <br />• Estimating costs to construct EB Sunwood Drive right turn lane <br />• Construction proposed to begin September 7, 2021 <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Construction to be completed fall 2021 <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 - 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 - 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 - 2023 <br />• NW Metro Regional Surface Water Supply Feasibility Study <br />• PWC to review final study findings July 20th <br />• City of Ramsey Water Treatment Plant <br />• Design/Constr. Admin. RFP issued, proposals due July 7, 2021 <br />• Submitted PPL & IUP funding applications <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary underway <br />• $84M+ funding secured, pursuing remaining funding <br />• NW Metro Mississippi River Crossing Feasibility Analysis <br />• No updates at this time <br />• TH 47 Safety Study <br />• Study updates to be presented in July <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Staff continues to monitor actions in other cities <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.