Laserfiche WebLink
• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed for 2023, pending City & County approvals <br />• City Council presentation anticipated June 22 <br />• CSAH 116 Interim Improvements <br />• Estimating costs to construct EB Sunwood Drive right turn lane <br />• Construction proposed to begin September 7, 2021 <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Construction to be completed fall 2021 <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 - 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 - 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 - 2023 <br />• NW Metro Regional Surface Water Supply Feasibility Study <br />• PWC to review final study findings July 20th <br />• City of Ramsey Water Treatment Plant <br />• Design/Constr. Admin. RFP issued, proposals due July 7, 2021 <br />• Submitted PPL & IUP funding applications <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary underway <br />• $84M+ funding secured, pursuing remaining funding <br />• NW Metro Mississippi River Crossing Feasibility Analysis <br />• No updates at this time <br />• TH 47 Safety Study <br />• Study updates to be presented in July <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Staff continues to monitor actions in other cities <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />