Laserfiche WebLink
m - STATE AID FOR LOCAL TRANSPORTATION <br />ac7:21Rxr°F SUPPLEMENTAL AGREEMENT <br />rw rM=ro�rr�r�aw <br />Rev. February 2018 <br />SP/SAP(s) <br />199-010-013; <br />199-108-004 <br />MN Project No.: <br />na <br />Supplemental <br />Agreement No. <br />1 <br />2573.501 <br />STABILIZED CONSTRUCTION EXIT <br />LUMP SUM <br />$2,100.00 <br />1 <br />$2,100.00 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE COMPOST <br />LIN FT <br />$3.75 <br />100 <br />$375.00 <br />2573.510 <br />SEDIMENT REMOVAL VAC TRUCK - <br />HOUR <br />$355.62 <br />4 <br />$1,422.48 <br />2574.507 <br />COMMON TOPSOIL BORROW <br />CU YD <br />$26.00 <br />100 <br />$2,600.00 <br />2574.508 <br />FERTILIZER TYPE 3 <br />POUND <br />$0.85 <br />45 <br />$38.25 <br />2575.504 <br />EROSION CONTROL BLANKETS CATEGORY 3N <br />SO YD <br />$2.30 <br />550 <br />$1,265.00 <br />2575.505 <br />SEEDING <br />ACRE <br />$1,325.00 <br />0.15 <br />$198.75 <br />2575.508 <br />SEEDING MIXTURE 25-121 <br />POUND <br />$5.35 <br />20 <br />$107.00 <br />2575.508 <br />HYDRAULIC BONDED FIBER MATRIX <br />POUND <br />$1.30 <br />170 <br />$221.00 <br />2582.503 <br />4" SOLID LINE MULTI COMP <br />LIN FT <br />$8.70 <br />180 <br />$1,566.00 <br />199-010-013 Subtotal <br />$33,557.98 <br />~ Increase (Riverdale Drive Improvements Non -Participating) <br />2104.502 <br />REMOVE VALVE BOX <br />EACH <br />$430.00 <br />19 <br />$8,170.00 <br />2504.602 <br />VALVE BOX <br />EACH <br />$970.00 <br />19 <br />$18,430.00 <br />Non -Participating Subtotal <br />$26,600.00 <br />Increase (Dolomite Street Demolition Non -Participating) <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$12,000.00 <br />0.4 <br />$4,800.00 <br />2105.607 <br />HAUL & STOCKPILE RECLAIM MATERIAL <br />CU YD <br />$9.20 <br />235 <br />$2,162.00 <br />2215.504 <br />FULL DEPTH RECLAMATION (6") (P) <br />SQ YD <br />$3.50 <br />1380 <br />$4,830.00 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE COMPOST <br />LIN FT <br />$3.75 <br />500 <br />` $1,875.00 <br />2574.507 <br />COMMON TOPSOIL BORROW <br />CU YD <br />$26.00 <br />225 <br />$5,850.00 <br />2574.508 <br />FERTILIZER TYPE 3 <br />POUND <br />$0.85 <br />110 <br />$93.50 <br />2575.505 <br />SEEDING <br />ACRE <br />$1,325.00 <br />0.35 <br />$463.75 <br />2575.508 <br />SEEDING MIXTURE 25-121 <br />POUND <br />$5.35 <br />35 <br />$187.25 <br />2575.508 <br />HYDRAULIC BONDED FIBER MATRIX <br />POUND <br />$1.30 <br />1300 <br />$1,690.00 <br />Non -Participating Subtotal <br />$21,951,50 <br />Net Change this Supplemental Agreement <br />i $73,988.48 <br />*' Group/funding category is required for federal aid projects. <br />Due to this change, the contract time: (check oric) <br />(X) Is NOT changed <br />May be revised as provided in MnDOT Specification 1806 <br />Is Increased by Working Days <br />( ) Is Decreased by Working Days <br />( ) Is Increased by Calendar Days <br />( ) Is Decreased by Calendar Days <br />Recommended by Project Engineer: �e',""'`, o �'L� Date: 5/11/2021 <br />Print Name: Kevin Kielb <br />Accepted by Contractor: ay.-4-Vigheik.--- <br />Print Name: ju tD ✓31,0A-ti. <br />Phone: (651) 968-7760 <br />Date: ~/2 <br />Phone: J2O-/F)-- `%6 <br />Page 2 of 3 <br />