My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/25/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 05/25/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:59:44 PM
Creation date
6/14/2021 12:31:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/25/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For projects that are selected, there are requirements for all plans with Trunk Highway impacts. Discuss these <br />with your design staff or include in your RFP/contract if you are using a consulting firm for design. These <br />requirements are: <br />• Quality Management Process (QMP) — Designers must have quality management procedures that they <br />use during plan development. It does not have to be the same process that MnDOT uses, but it has to <br />follow reasonable quality control guidelines and designers must certify that they are using such a <br />process. A compliance form and more information will be provided during design. Details on MnDOT's <br />process can be found here: httlif/www.dot.sidie.mn.usidesign/qmp/index.html <br />• Transportation Management Plan (TMP), if applicable — Projects with significant impacts to Trunk <br />Highway traffic require a TMP that is reviewed and approved by Metro Traffic staff. The complexity of <br />the TMP will depend on the complexity of the project and the level of traffic impact. Contact either the <br />Metro Traffic division or LPP Project Manager for more details. <br />• Electronic as-builts — This is required for certain elements of projects, is an eligible construction cost <br />item, and should be included in the Statement of Estimated Quantities and Special Provisions. <br />• Responsible Contractor provision — This is required by Minnesota Law and Statute for projects over <br />$50,000. <br />• Pedestrian facilities - Guidelines for pedestrian and facilities and the influence of the Americans with <br />Disabilities Act (ADA) provisions continue to be refined. Technical Memoranda No. 18-04-OP-01 provides <br />some additional design requirements. http://tech=rierTrios.do.stake.rrr.us/tecrrVierno.aspx <br />Local Partnership projects have received added scrutiny regarding Cost Participation Policy eligibility. If a <br />proposed project is of marginal benefit to the Trunk Highway system, it may be necessary to complete a benefit - <br />cost analysis and have it approved by MnDOT staff in order to secure funding. <br />Projects that are selected will be required to furnish: <br />• Cultural and Threatened & Endangered Species Review Request Form: <br />http://www.dot.state.i 111 �.us/stateaid/projectdelivery/environmental/cultural-threatened-endangered- <br />review-request.docx <br />• Project schedule - Work with the LPP Project Manager to establish a schedule for the project <br />completion. The Project Manager will discuss with you the various review stages and typical time <br />requirements. <br />A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.