Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE <br />LOCAL PARTNERSHIP PROGRAM APPLICATION <br />RIVERDALE DRIVE EXTENSION <br />CITY OF RAMSEY, MN <br />NON -PARTICIPATING <br />WATERMAIN <br />jNTITY AMOUNT <br />0 <br />0 <br />, <br />61 <br />{/} <br />0 <br />o� <br />00 <br />t/} <br />REMOVE BITUMINOUS PAVEMENT 4,100 SQYD $4.00 $16,400.00 4,100 $16,400.00 <br />COMMON EXCAVATION (P) (EV) 11,810 CU YD $12.00 $141,720.00 11,810 $141,720.00 <br />AGGREGATE BASE CLASS 5 11,900 TON $16.00 $190,400.00 11,900 $190,400.00 <br />BITUMINOUS PAVEMENT (ROADWAY AND TRAIL) 6,600 TON $75.00 $495,000.00 6,600 $495,000.00 <br />CONCRETE CURB & GUTTER DES B618 9,300 LIN FT $14.00 $130,200.00 9,300 $130,200.00 <br />RC PIPE APRON 2 EACH $2,000.00 $4,000.00 2 $4,000.00 <br />SANITARY SEWER MANHOLE W/ CASTING 16 EACH $7,850.00 $125,600.00 16 $125,600.00 <br />CONNECT TO EXISTING WATER MAIN 2 EACH $2,000.00 $4,000.00 2 $4,000.00 <br />0 <br />0 <br />00 <br />t/} <br />0 <br />0 <br />o <br />M <br />c-I <br />t/} <br />$446,400.00 <br />0 <br />0 <br />0 <br />t/} <br />EROSION CONTROL AND SITE STABILIZATION 1 LUMP SUM $64,000.00 $64,000.00 1 $64,000.00 <br />SEEDING 8 ACRE $12,500.00 $100,000.00 8.00 $100,000.00 <br />PAVEMENT STRIPING 4,800 LIN FT $7.00 $33,600.00 4,800 $33,600.00 <br />ci <br />O <br />i <br />Nc <br />O <br />Q1 <br />M <br />6,200 <br />2,500 <br />O <br />O <br />OO <br />F <br />ROADWAY STORM SEWER SANITARY SEWER <br />TOTAL <br />TEM ESTIMATED UNIT UNIT PRICE TOTAL AMOUNT QUANTITY <br />QUANTITY <br />O <br />O <br />O <br />N <br />inin <br />O <br />O <br />O <br />O <br />OO <br />I� <br />O <br />O <br />ci <br />00 <br />ci <br />O <br />00 <br />ci <br />O <br />4,500 <br />ci <br />PARTICIPATING <br />O <br />O <br />OO <br />� <br />O <br />O <br />OO <br />',Jr),Ln <br />ih <br />$86,240.00 <br />O <br />O <br />O <br />O <br />O <br />O <br />r00 <br />l <br />O <br />O <br />� <br />Ii/? <br />5,000 <br />OO <br />M <br />00 <br />O <br />cMI <br />O <br />cM-I <br />O <br />O <br />O <br />O <br />O <br />N <br />. <br />tn. <br />O <br />O <br />N <br />ci <br />t/} <br />$48,000.00 <br />O <br />O <br />O <br />ON <br />,—I <br />if, <br />$12,500.00 <br />$140,000.00 0.48 <br />$40,000.00 0.48 <br />00 <br />O <br />I� <br />�-I <br />O <br />LOn <br />O <br />g <br />O <br />l!) <br />O <br />g <br />00 <br />� <br />I11 <br />N <br />rI <br />ci <br />O <br />g <br />O <br />L() <br />O <br />O <br />I11 <br />Ql <br />in- <br />N <br />lD <br />00 <br />O <br />I11 <br />L() <br />O <br />O <br />O <br />Ol <br />in <br />O <br />L() <br />Ln <br />O <br />g <br />00 <br />N <br />O <br />O <br />N <br />M <br />c-I <br />$446,400.00 <br />O <br />O <br />L() <br />in <br />$12,500.00 <br />OOO <br />in- <br />O <br />O <br />O <br />O <br />us <br />in- <br />O <br />O <br />I!) <br />,' <br />O <br />O <br />O <br />/} <br />O <br />O <br />O <br />tIr/ <br />O <br />O <br />O <br />M <br />O <br />O <br />O <br />r-I <br />t/} <br />O <br />O <br />(OO <br />in- <br />O <br />O <br />$72.00 <br />O <br />O <br />tMr/} <br />$140,000.00 <br />$40,000.00 <br />O <br />O <br />',I'd <br />O <br />O <br />Ln <br />$25.00 <br />LUMP SUM <br />EACH <br />SQ FT <br />LUMP SUM <br />LUMP SUM <br />CU YD <br />LIN FT <br />EACH <br />CU YD <br />LIN FT <br />EACH <br />EACH <br />EACH <br />LIN FT <br />POUND <br />H <br />Cr <br />Ln <br />ci <br />00 <br />150 <br />5,000 <br />3,900 <br />OS <br />Ql <br />M <br />6,200 <br />2,500 <br />ci <br />ci <br />4,500 <br />c-I <br />O <br />DEWATERING <br />PEDESTRIAN CURB RAMPS <br />SIGN PANELS TYPE C <br />CHANNNEL & POND EXCAVATION <br />STORM SEWER RC PIPE <br />DRAINAGE STRUCTURE W/ CASTING <br />RANDOM RIPRAP CL III <br />PAVEMENT MARKINGS <br />MOBILIZATION <br />TRAFFIC CONTROL <br />PVC PIPE SEWER <br />CONNECT TO EXISTING SANITARY MANHOLE <br />6" GATE VALVE & BOX <br />HYDRANT <br />WATERMAIN DUCTILE IRON <br />WATERMAIN FITTINGS <br />ROUNDED TOTAL AMOUNTS <br />